My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2013-03-11
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2013
>
AgdaPkt 2013-03-11
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2013 4:28:35 PM
Creation date
3/7/2013 4:37:19 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Regular
Agency Type
City Council
Date
3/11/2013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
921
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
7.A. - Page 32 <br /> Redwood City Chapter 1.Introduction <br /> Circulation and Planning Commission Consideration of <br /> Addendum <br /> Under Section 15164(c) of the CEQA Guidelines,an Addendum does not need to be circulated for <br /> public review.The decision-making body(i.e.,Planning Commission) is required to consider this <br /> Addendum No. 2 along with the 2007 Final EIR prior to making a new decision on the project(CEQA <br /> Guidelines Section 15164[d]).This Addendum No.2 has been posted to the City`s website <br /> (www.redwoodcity.org) and has been made available at the Redwood City Planning Division, 1017 <br /> Middlefield Road, Redwood City,CA 94064. <br /> Incorporation by Reference <br /> In compliance with CEQA Guidelines Section 15150,this Addendum No. 2 has incorporated by <br /> reference the 2007 FEIR (SCH#: 2005092047),several technical studies,analyses,and reports that <br /> were prepared as part of the 2007 FEIR,and several new technical studies and reports that were <br /> prepared in 2011 and 2012 for the proposed modifications. Information from documents <br /> incorporated by reference into this Addendum No.2 have been briefly summarized in the <br /> appropriate section(s)which follow,and the relationship between the incorporated part of the <br /> referenced document and this Addendum No.2 has been described.The documents and other <br /> sources which have been used in the preparation of this Addendum No.2 are identified in Chapter 9, <br /> References. <br /> Methodology <br /> The environmental analysis contained in this Addendum No.2 has been developed to adequately <br /> address the environmental issues associated with the proposed modifications described in Chapter <br /> 3,in consideration of new information and changed conditions since the certification of the 2007 <br /> FEIR.This format is consistent with the format of the 2007 FEIR,presented below,with a brief <br /> discussion of the information included within each topic. <br /> Environmental Setting <br /> The environmental setting of the project site remains substantially the same as it existed at the time <br /> of publication of the NOP for the Draft EIR in 2006.The most substantial change to the <br /> environmental setting relates to the opening on the project site of the Costco Warehouse and Tire <br /> Station with a 12-station fueling center in 2009. However,some conditions external to the project <br /> site,such as traffic levels,are different than in 2006.A detailed description of the changes in the <br /> environmental setting since the certification of the 2007 FEIR,including applicable plans and <br /> policies,is included in Chapter 2. <br /> Thresholds of Significance <br /> Consistent with the 2007 FEIR,significance criteria used in the analysis in Chapter 4, Environmental <br /> Impact Analysis,are derived from Appendix G of the CEQA Guidelines.In addition,City policies, <br /> Addendum No.2 to the Environmental Impact Report for September 2012 <br /> the Redwood City Costco Wholesale Project 1-3 ICF 00154.12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.