My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2013-03-11
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2013
>
AgdaPkt 2013-03-11
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2013 4:28:35 PM
Creation date
3/7/2013 4:37:19 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Regular
Agency Type
City Council
Date
3/11/2013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
921
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
7.A. - Page 298 <br /> of the main Costco ingress at Middlefeld and Willow, at the back corner of th� <br /> Orchard Supply Hardware garden cenfer. The re�ised site circulation plan shall <br /> be subject to the revi�w and approval of the City, prior to installation by <br /> Applicant. <br /> 5. Prior to the issuance of a B�ailding Permit, Applicant shal! pay in full <br /> afl outstanding Planning Cost Reco�ery charges, induding fees incurred far use <br /> of Special Counsei. <br /> 6. Where applicable ali new construction shall be in conformance with <br /> the 2010 California Building, Mechanical, Electrical, Plumbing, Energy and Green <br /> Building Standards and Redwoad City Green Building codes. <br /> 7. Applican� shall submit plans for on-site lighting improvements <br /> (design, spacing and height) to City Planning & E�gineering departments, for <br /> prior review and appra�al by Planning & Engineering staff and which plans, as <br /> appro�ed, shalf be impfemented by Applicant. <br /> 8. Applicant shall obtain a Sign Permit priar to sign instaflation. <br /> 9. The project shall meefi all ather necessary Engineering, Fire and <br /> Bui�ding Department conditions of approval incfuding, but not limited to, the <br /> following: <br /> 10. Applicant shall st�bmit a tree protection plan showing that afl trees <br /> 12-incl�es in diameter and farger to remain wilf be protected during construction. <br /> 11. Appiicant shal� post Perfarmance and Labor & Materials Bonds for <br /> alf improvements to be dedicated to the City. <br /> 12. Appficant shall install undergrour�d facifities per Redwood City's <br /> �ew de�efopment standards. <br /> 13. Applican# shafl pay all appficable wat�r, recycfed water, <br /> wastewater, and transportation related fees prior ta permit issuance. <br /> 14. For construction acti�ity resulting in a land disturbance of ane acre <br /> ar more, applicant shafl file a Notice of Intent (NOI) with the State Water <br /> Resources Cor�trol Board under the Construction Acti�ities Storm Water General <br /> Permit (General Permit). The NOI shail indicate the applicant's int�nt to camply <br /> with t�e San Mateo Cauntywide Sformwater Pollution Prevenfian Program, <br /> including a Stormwater Pollutian Prevention Plan {SWPPP). <br /> (www.scrcb.caqavlstormwtr/construction�htm!). <br /> 15. Plans shall be designed to meet the C3 requirements af the <br /> Mun�cipal Regional Permit {MRP) NPDES Permit CAS 612008. <br /> ATTY/RES0.2793 PC USE PERM�T MODIFICATION AfVQ A NEW ARCHITECTURAL PERMlT FOR GOSTCO <br /> REV: 10-19-12 VR <br /> Page 6 of 1U <br />
The URL can be used to link to this page
Your browser does not support the video tag.