My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt75 South Bayside System Aut - Silicon Valley Clean Water
RedwoodCity
>
City Clerk
>
Agreements
>
1970-1979
>
1975
>
Agmt75 South Bayside System Aut - Silicon Valley Clean Water
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2014 4:18:50 PM
Creation date
3/25/2004 12:12:50 PM
Metadata
Fields
Template:
Agreement
Contractor Name
South Bayside System Authority
PROJECT NAME
joint exercise of powers agreement
RMP File Number
304 bin 12
Date
11/13/1975
Reso Ref
14870
Amendment
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
110
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
� aFS:djg-c 2/21/84 <br /> � ' :�:djg-c 3/05/84R <br /> ' bES:djg-c 3/12/84R <br /> � 2. Section 1.22 of the Agreement is hereby amended to read <br /> as follows: <br /> "Section 1. 22. Joint Facilities. 'Joint Facilities' <br /> means the 1969 Facilities, a11 facilities conveyed to the <br /> Authority pursuant� to Section 5.8 hereof, Stage 1 of the Project <br /> and Stage 2 of the Project. " <br /> 3. Section I.23 of the Agreement is hereby amended to read <br /> as follows: <br /> "Section 1. 23. Jaint Conveyance Facilities. 'Joint <br /> Conveyance Facilitie� ' means those facilities shown in Exhibit D <br /> attached hereto and hereby made a part of this Aareement and <br /> generally described as follow�: <br /> °The new West Bay pumping plant and new force inain to <br /> � Redwood City; the existing Redwood City pumping plant and force <br /> main to San Carlos; �he new San Carlas pumping plant; the exis�ing <br /> Belmont pumping plant; the existing force main extending from the <br /> new San Carlos pumping plant to the deep water end of the bay <br /> outfa�.l, including connections to the new treatment plant of the <br /> Authority to be constructed at Redwood Shores (Stage 1 of the <br /> Project) ; and the existing Belmont force main extending from the <br /> existing Belmont purnping plant to a new connection ito be <br /> constructed) with the existing force main to the deep water end of <br /> the bay outfall. " <br /> 4. Section 1.25 of the Agreenlent is hereby amended to read <br /> as follows: <br /> "Section 1. 25. Menlo. 'Menlo' means the formerly <br /> � <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.