Laserfiche WebLink
� R�S:djg-c 2/21/$4 <br /> . , • `?�:djg-c 3/05/B4R <br /> • � li�S:djg-c 3/12/84R <br /> � named Menlo Park Sanitary District, which �ubsequent to entering <br /> into the Aqreement changed its name to West Bay Sanitary District, <br /> a sanitary district duly organized and existing in the County <br /> under the Sanitary District Act of 1923 (Sections 6400 et seq. of <br /> the Health and Safety Code of the State� , and the Constitution of <br /> the State {see also, definition of 'West Bay' } " . <br /> 5. Section 1. 29 of the Agreement is hereby amended to read <br /> as follows: <br /> "Section 1. 29. Project. ' Project' means Stage 1 of <br /> the Project and Stage 2 of the Project. 'Stage 1 of the Pro�ect' <br /> means Alternative SB-B as set farth and described in the Fra3ect <br /> Report. The elements of said Alternative SB-B are listed as items <br /> 1 to 7 inclusive, in Exhibit A hereto. <br /> � " 'Stage 2 ot the Pr.oject' means the expansion of the <br /> Joint Facilities from a designed wastewater treatment capaci.ty <br /> valume of 24 million ga�Ions per day average d.aily dry weather <br /> �low to 30 million galZons per day. Stage 2 af the Praject shall <br /> be acquired and c�nstructed in four substages ( 'Substages I-4' } <br /> ' comprised of a.mprovements or additions to Stage 1 of the Praject <br /> increasing the aforesaid designed capacity in increments of 2, 1 , <br /> I, and 2 millions of gallons per day flow, respectively. The <br /> elements of Stage 2 of the Projact and the substages thereof are <br /> described in Chapter 6 of that certain report dated August 1983 <br /> entitled 'Report on Capacity Study and Long Range Plan for <br /> Wastewater Treatment Plant Enlargements, South Bayside System <br /> � Authority' , preparec3 by Kennedy/Jer�ks Engineers, Consulting <br /> 4 <br />