My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt84 South Bayside System Aut
RedwoodCity
>
City Clerk
>
Agreements
>
1980-1989
>
1984
>
Agmt84 South Bayside System Aut
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/5/2005 2:37:41 PM
Creation date
3/25/2004 12:12:59 PM
Metadata
Fields
Template:
Agreement
Contractor Name
South Bayside System Authority
PROJECT NAME
suppl agmt III - joint exercise of powers
RMP File Number
304 bin 12
Date
4/26/1984
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> ,0-" P-F..S:djg-c 2/21/84 <br />, :S:djg-c 3/0S/84R <br />." <br /> DES:djg-c 3/12/84R <br />. Agency directs the Authority to apply its share of such remaining <br /> funds toward its obligation to fund the next Substage of Stage 2 <br /> of the Project; provided, however, that upon completion of <br /> construction of Substage 4, or any other prior Substage which is <br /> the final Substage of construction, any such remaining funds shall <br /> be returned proportionately as aforesaid. <br /> "The Commission shall determine the connection fee to <br /> be charged by the Agencies for financing the construction of Stage <br /> 2 of the Project based upon a cost-pricing method under <br /> which the users of the treatment capacity constructed and <br /> established by Stage 2 of the Project shall be assessed the <br /> cost of construction thereof. The fee as established <br />. by the Commission shall be based upon the estimated total cost of <br /> construction (including provision for cash flow requirements and <br /> fees and costs of related necessary services) of the entire Stage <br /> 2 of the Project, notwithstanding that said Stage 2 shall be <br /> constructed in Substages. Said fee shall be expressed in dollars <br /> per gallon per day volume of wastewater treatment capacity. <br /> liThe Authority shall notify each Agency of the amount of <br /> said fee, and each such Agency shall, and does hereby agree to, <br /> implement and charge such fee in its wastewater connection fee <br /> system, such that that portion of the wastewater connection fee <br /> (howsoever designated by the Agencies, respectively) charged, <br /> assessed or otherwise collected by said Agencies which represents <br /> the cost of construction of Stage 2 of the Project shall be <br />. uniform amongst all of said Agencies. Not less than annually <br /> 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.