My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt13 Moore, Iacofano and Goltsman, Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2013
>
Agmt13 Moore, Iacofano and Goltsman, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2015 4:34:55 PM
Creation date
7/10/2013 2:01:27 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Moore, Iacofano and Goltsman, Inc.
PROJECT NAME
Inner harbor Specific Plan Community Engagement Strategy
RMP File Number
304.5
Date
6/19/2013
MO Ref
13-057, 13-147, 15-098
Amendment
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
presentation and other materials used in previous Task Force meetings and community <br /> workshop will be repurposed for use in the Study Session. <br /> Phase A Meetings and Deliverables <br /> ■ Technical Mapping <br /> ■ Technical Memoranda: Land Use, Circulation, Economic/Market, Infrastructure, <br /> Opportunities and Constraints Analysis <br /> ■ Plan Objectives and Criteria Evaluation Matrix <br /> ■ Alternative Pro/Cons <br /> ■ Task Force Meeting 4, 5, and 6 including meeting materials, meeting summary, <br /> and PowerPoint presentation, as appropriate <br /> ■ Preliminary Alternatives — up to five <br /> ■ Draft Alternatives —three <br /> ■ Alternatives Workshop <br /> ■ Preferred Alternative including map, buildout estimates <br /> ■ Study Session presentation and attendance <br /> PHASE B — DRAFT PLAN, PUBLIC REVIEW, ADOPTION <br /> Task 6 Administrative Draft Specific Plan <br /> 6.1 Prepare Administrative Draft Specific Plan <br /> Consultant will prepare an Administrative Draft Specific Plan for review by the City's <br /> Inner Harbor Project Manager. Based on our discussions with City representatives, <br /> consultant will prepare the Specific Plan to address State and local requirements and <br /> the plan will contain all information necessary to allow the project to move toward <br /> entitlement quickly. Up to five visual simulations will be prepared for use in the EIR. <br /> The streamlined Specific Plan will consist of the following sections: <br /> ■ Introduction, including project summary, specific plan objectives, and relationship <br /> to General Plan policies <br /> ■ Site development plan (permitted uses, development standards, design <br /> standards, open space) <br /> ■ Circulation: vehicular and non-vehicular (marine and land-based) <br /> ■ Infrastructure and utilities <br /> ■ Open space <br /> ■ Public services <br /> ■ Phasing and financing <br /> ■ Specific Plan administration <br /> Consultant scope assumes one round of revisions of the Administrative Draft document. <br /> 6.2 Financing and Implementation Strategy <br /> ATTY/AGR/2013.123/MIG Inner Harbor Amendment No.1 <br /> REV:07-24-13 VR <br /> Page 8 of 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.