Laserfiche WebLink
through 8-28, Draft �IR appendix 21.4 (Supplemental Air Quality and Climate <br /> Change Infarmation), and Final EIR appenclix B (Suppoemental �ay Area Air <br /> Quality Management District [BAAQMD] I�formation?, which are hereby <br /> incorparated by reference. . <br /> Climate Change <br /> Impact: Impact 9-7: Sea Level Rise Impacts on Project De�elupment. 8ased on the <br /> BCDC sea level rise maps, the project may be affeefed by anticipated sea level <br /> rise and associated changes in broader flood plain baundaries. Patential impacts <br /> associated with future develo�ment tf�at may be subject to sea lerrel rise include <br /> risk to public safety and property damage. <br /> Mitigation: Mitigation 9-1. For all new development on the project development site, the <br /> City shall ensure that the development compiies with the most current Redwood <br /> City General Plan and Redwood City M�nicipal Code requirements for pro#ection <br /> fram flofld hazards, consistent with Mitigation 90-3 in chapter 10 (lJtiiities), of the <br /> Draft �IR. These provisions would require compliance wit� associated storm <br /> drainage storage, building ele�ation, and flood-proofrng reauirements. <br /> Finding: Implementation of Mitigation 9-1 wauld reduce sea level rise ir�pacts to a less- <br /> fhan-sign�cant level. <br /> Facts in Support of Finding: Implementation of Mitigation 9-1 wauld reduce the sea level rise <br /> impacts on project development to a less-tt�ar�-sign'rFicant level by ensuring that <br /> alf new on-site de�eiopment complies wit� the most current Redwaod City <br /> Generaf Plan and Redwoad City Municipaf Code requirements for protection from <br /> flood hazards, as described ar�d quantified in Draft EIR chapter 9 (Ciimate <br /> Change),wF�ich is hereby incorporated by reference. <br /> Cultural and Historic Reso�rces <br /> fmpact: Impact 14-1: Project and Cumulative Impacts on Historic Resaurces. The <br /> propased Precise Plan cantains development standards that would allow for the <br /> demolition of all structures on the de�elopment site, and Stanford has indicated <br /> that its long-term p1ar� is ta dernolish afl af the existing structures an the <br /> development site and relocate the Ampex sign. Subsection �4.1.3 of the Draft <br /> EIR identifies three potential historic resaurces on the development site—the 425 <br /> Broadway building, the plaza area with the Warnecke Fountains, and the Ampex <br /> sign. Although the historica! resources survey repart and 2009 Circa peer review <br /> do not find that any of these three structures are historic resources, the 2009 and <br /> 2011 Circa peer review repvrts do suggest special consideratian be given to <br /> these structures in the planning process. Some members of the HRAC have <br /> indicated that they preliminarify disagree with the canclusions in the reports that <br /> these structures are nat potential historic resaurces; however, the HRAC has yet <br /> to make a recommendation as to whether these structures shauld be included on <br /> the City's register of hEStorical resources. CEQA Guidelines section 15064.5(a)(4) <br /> allows a lead agency to determine t�at a resource is a h istoric resource despite <br /> the fact that the resource is not listed in the Cafifflrnia Register of Historical <br /> ATTY/RE50.2898/PG RE50 RECOMMENpING STANF4RQ EIR CE#iTIFICATION <br /> ftEV:D&15-13 VR <br /> Page 14 of 56 <br />