Laserfiche WebLink
areas should be moved if it is determined that flooding conditions are imminent. <br /> In addition, the existing Midpvint Technology F'aric development remains subject <br /> to Certified Mitigation 7-4 from the 1996 Midpoint Technology Park EIR. 7he <br /> applicable text of the rrtitigation states, "[I]f and when the City decides ta improve <br /> the [downstream] storm drainage facility, the developer(or heirs) will be required <br /> to deposit funds with the City as `fair share' {for stormwater runoff impacts <br /> caused or�ly by the new [i.e., Midpoint Technology Par�C] der►elopment) <br /> �articipa#ion in the system's construction casts." <br /> Finding: Implementation af Mi#igation 10-3 would reduce the identified fiooding im�act to a <br /> Iess-than-sign�cant level. <br /> Facts in Support of Finding: Implementation of Mi#igatiori 10-3 would reduce the project <br /> impact or� f�ooding potential ta a less-than-significant level through a combination <br /> of site design, architectural design, and engineering soiutions s�abject to re�iew <br /> and approval of the City Building, fnfrastructure ar�d Transportation Department, <br /> resulting in no net increase in off-site flooding compared to sxisting conditions. <br /> These facts are described a�d quantified in Draft EIR chapter 10 (Utilities), <br /> section 10.3 (Storm Drainage and Water Quali#y), on pages 10-23 through 1D-36, <br /> which is hereby incorporated by reference. <br /> ATTY/RE50.2898/PC RE50 REGOMhNENDING STANFORD E!R CERTlFICATION <br /> REV;08-15-13 VR <br /> Page 45 of 56 <br />