My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt13 Environmental Science Associates
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2013
>
Agmt13 Under 60K
>
Agmt13 Environmental Science Associates
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2016 10:40:16 AM
Creation date
9/4/2013 1:41:41 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Environmental Science Associates
PROJECT NAME
draft baseline reports to support City's development of lasnd use alternatives and Specific Plan for Innrer Harbor Area
RMP File Number
304
Date
8/29/2013
MO Ref
13-200 of 11/18/2013 Amend 2 MO 15-099
Amendment
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Harbor Speci�c Plan: Draft ElR Travel Demand Forecasts (September 25, 2014). <br /> However, the analysis will be a qualitative description of the relative transportation <br /> effects and an site plan assessment. Fehr & Peers will forecast vehicle trip distribution <br /> and assignment pattems consistent with the IHSP EIR methodology. Other than trip <br /> generation, no other quantified data will be generated for the alternatives. All results will <br /> be presented in matrix or other tabular form. <br /> Modified "Technical Work Assumption° <br /> 20. The assessment of up to five (5) alternative land use scenarios to be prepared for <br /> the Draft EIR (Task 5)will be conducted at a qualitative level only. If the City elects <br /> to have ESA conduct a quantitative analysis (i.e., quantified air quality and GHG <br /> emissions, roadway noise assessment, onsite population and trip generation, but <br /> not full LOS analysis for the alternative). This may be addressed by the original <br /> Task 8, Additional Tasks, (to the extent adequate Task 8 budget is available). <br /> Cost Summarv Task C <br /> The total cost of the additional services described for "Expanded EIR Alternatives" is <br /> $14,010, as summarized below. <br /> EXPANDED ALTERNATIVES ANALYSIS TASK <br /> Actual/Estimated Total Cost <br /> Labor Hours <br /> ESA(Task 5) 24 $4,740 <br /> Fehr 8�Peers $9,270 <br /> Total 514,010 <br /> REV:06-15-15 VR <br /> Page 6 of 18 <br /> ATTY/AGR.Amend No.2lESA Inner Harbor EIR Amendment No.2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.