My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt13 Environmental Science Associates
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2013
>
Agmt13 Under 60K
>
Agmt13 Environmental Science Associates
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2016 10:40:16 AM
Creation date
9/4/2013 1:41:41 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Environmental Science Associates
PROJECT NAME
draft baseline reports to support City's development of lasnd use alternatives and Specific Plan for Innrer Harbor Area
RMP File Number
304
Date
8/29/2013
MO Ref
13-200 of 11/18/2013 Amend 2 MO 15-099
Amendment
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
: . .�:.: . ,, �,��,„u <br /> sT� ,�, � �.� � ,:,.�� �� . � . ��� � ����� <br /> r' k 5;'��y . .�.�,.. <br /> ` �. k�H�. <br /> <<.�. :t"w ;'.. .. ......... �.. .,.. ' ., <br /> ,. <br /> .. ... �ru. .w, �:1... . '�atr� <br /> Context: E To assess whether the Project would have project-level j Assumptions: <br /> The IHSP EIR would have desaibed E impacts or contribute to any cumulative impact,ESA will: E . The Project analysis will rely <br /> the IHSP transportation/traffic setting E . Review and incorporate into the Addendum or SEIR,work to � on a similar study area, <br /> that would also apply to the Project. ��nducted by Fehr&Peers,as subconsultant to ESA. � s�milar study facilities,and <br /> ? will be based on the same <br /> The IHSP EIR would have presented a ; Fehr&Peers wilL• j existing conditions data and <br /> level of service analysis for the near-and bng-term traffic <br /> roadway system(including key Impact Analvsis E forecasts used for the <br /> intersections and freeway segments) ; . Conduct a project-level transportation impact analysis of the � program analysis for the <br /> and the qualitative assessments of i Harbor View Place Project in the conte�of the IHSP and as � IHSP. <br /> potential impacts to the bicycle, a complete section of the Addendum or SEIR. <br /> pedestrian and transit systems. ` <br /> The Alternatives anal sis in the IHSP � ' Conduct the traffic operations analysis that indudes the <br /> Y study intersections and freeway segments for AM and PM � <br /> EIR also would have presented a peak hour levels of service consistent with the IHSP EIR. � <br /> qualitative assessment of a higher <br /> mtensity Alternative with development • In addition to the study locations assessed in the IHSP EIR, � <br /> of the proposed Harbor View Place include four(4)additional driveways from the project site ! <br /> Project generally encompassing the onto Blomquist Street and one(1)additional intersection at � <br /> IH-2 area of the IHSP(instead of the Seaport Boulevard/Lyngso Lane into the traffic operations <br /> development intensityldensity analysis in order to fully account for project-specific features. F <br /> envisioned for IH-2 with the IHSP � , prepare the detailed analysis evaluating potential impacts to <br /> preferred scenario).The qualitative traffic operations,transit sernce,bicycle activity,and � <br /> Alternatives analysis would have � �estrian activity for the following scenarios: <br /> calculated trip generation estimates for j <br /> the Project. - E�tisting Plus Project Conditions � <br /> - Cumulative No Project Conditions i <br /> - Cumulative with Project Conditions � <br /> ' * Report performance measures that include the approach � <br /> � queues for the additional study locations presented above. <br /> = Update the SynchrolSimTraffic model aeated for the Inner � <br /> Harbor Specific Plan and US 1011SR 84 Interchange Pro1'ect <br /> study with the above study locations under the Existing Plus <br /> Project and Cumulative Plus Project scenarios. <br /> ` • Update Cumulative No Project conditions to reflect the <br /> buildout of the IHSP(Maximum Theoretical Buildout <br /> scenario)without any development at the Harbor V'�ew <br /> project site(IH-2 area). <br /> ; Site Plan Review <br /> � <br /> _• Conduct a site access and circulation assessment for <br /> vehicles,bicycles,and pedestrians around the project site <br /> > and on the adjacent roadways.To the extent adequate detail � <br /> ', is provided by the project sponsor(see Data Needs),this � <br /> assessmentwill address: <br /> - Site access and interface with roadway network <br /> including corner sight distances and a review of <br /> driveway spaang <br /> � - Emergency vehicle access and arculation <br /> j - Vehicular circulation and roadway sizing within the <br /> i site <br /> i <br /> - Pedestrian access and circulation within and <br /> adjacent to the site <br /> � <br /> - Bicyde access and circulation within and ad�acent to <br /> REV:06-15-15 VR <br /> Page 15 of 18 <br /> ATTY/AGR.Amend No. 2/ESA Inner Harbor EIR Amendment No.2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.