My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Res13 15294
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
2010-2019
>
2013
>
Res13 15294
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2013 1:28:45 PM
Creation date
9/11/2013 4:27:39 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Regular
Agency Type
City Council
Date
9/9/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
EXHIBIT D 09/09/2013 <br /> MONITORING VERIFICATION <br /> IDENTIFIED IMPACT RELATED MITIGATION MEASURE Implementation Monitoring and Timing Signature Date <br /> Pe1'fOrmanCe Crlterla Entity Verification Entity Requirements <br /> greater. This could be achieved in a <br /> number of ways: <br /> 1. Install fewer than the assumed 13 new <br /> generators; <br /> 2. Install generators with lower emissions <br /> (in this case,smaller generators); <br /> 3. Test new generators at lower running <br /> loads(the analysis assumed 100-percent <br /> load,so 50-percent load would reduce <br /> emissions);and/or <br /> 4. Reduce the number of annual testing <br /> hours. <br /> The applicant shall submit an analysis of <br /> the new generator emissions prior to <br /> installing more than five new generators at <br /> the project development site. <br /> Implementation of this measure to reduce <br /> generator emissions would reduce ROG <br /> emissions by 2.7 pounds per day,which <br /> would result in total ROG emissions of 53.1 <br /> pounds per day,which is below the <br /> BAAQMD significance threshold of 54 <br /> pounds per day. However,this mitigation <br /> measure would reduce PM,o emissions by <br /> a minimal amount,leaving PM,o emissions <br /> above the BAAQMD significance threshold. <br /> Therefore,as currently proposed,the <br /> project would result in a signii►cant <br /> unavoidable project and cumulative <br /> o erational air ualit im act. <br /> Impact 8-3: Community Risk and Hazard Mitigation 8-3. Buffer the child care center Applicant City Prior to PC permit <br /> Impacts. Project development could expose from existing and planned emission issuance; prior to <br /> attendees of the on-site child care center to sources,and include project features to building permit <br /> significant levels of PMZ.S. Significant reduce TAC and PMZ.S exposure from air issuance; prior to <br /> impacts from the Tyco Thermal Controls pollutant sources--which include US 101 occupancy permit <br /> Facility to attendees of the proposed child traffic,the Tyco Thermal Controls facility, issuance <br /> care facility are anticipated to be significant and existing and proposed generators-- <br /> regardless of where the child care facility is through the following measures: <br /> located within the Precise Plan area. This <br /> project-related effect is considered to 1. When construction of a child care <br /> represent a signii►cant project and center is proposed,conduct site- <br /> cumulative im act. specific detailed analysis to determine <br /> Page 20 20 r 1106721FElRIMMRP Checklist(10672J.doc <br /> RESO. 15294 <br /> MUFF#100 <br />
The URL can be used to link to this page
Your browser does not support the video tag.