Laserfiche WebLink
EXHIBIT D 09/09/2013 <br /> MONITORING VERIFICATION <br /> IDENTIFIED IMPACT RELATED MITIGATION MEASURE Implementation Monitoring and Timing Signature Date <br /> Pe1'fOrmanCe Crlterla Entity Verification Entity Requirements <br /> the child care center's TAC and PMZ.S <br /> exposures. The analysis should be <br /> utilized to guide final design and siting <br /> of the child care facility and determine <br /> the level of ventilation/filtration <br /> necessary to ensure that indoor <br /> concentrations will be less-than- <br /> significant. <br /> 2. Evaluate and appropriately buffer the <br /> child care center from existing diesel <br /> generators at the Stanford Medicine <br /> Outpatient Center and 550 Broadway, <br /> and any other sources near the Precise <br /> Plan area identified by BAAQMD at the <br /> time such analysis is undertaken. <br /> 3. Ensure that the ventilation/filtration <br /> systems in the child care center result <br /> in an indoor cancer risk of less than 10 <br /> in one million and annual PMZ.S <br /> concentrations of less than 0.3�ag/m3 <br /> from any single source or less than 100 <br /> in one million cancer risk and annual <br /> PMZ.S concentrations of less than 0.8 <br /> �ag/m3 from cumulative resources. <br /> 4. Consider tiered plantings of trees <br /> between the child care center and air <br /> pollutant sources such as the freeway, <br /> existing and planned generators,and <br /> the Tyco Thermal Controls facility. <br /> 5. Avoid location of any truck loading <br /> zones near the child care facility. <br /> 6. With respect to outdoor use areas for <br /> the child care center,impacts from US <br /> 101 shall be mitigated by placing the <br /> child care center more than 700 feet <br /> from the freeway. Based on currently <br /> available information,the impact from <br /> Tyco Thermal Controls cannot be <br /> mitigated to a less-than-significant level <br /> because the elevated PMZ.S levels from <br /> the facility extend across the entire <br /> project development site. If the Tyco <br /> Thermal Controls facilit remains in <br /> Page 21 21 r 1106721FElRIMMRP Checklist(10672J.doc <br /> RESO. 15294 <br /> MUFF#100 <br />