Laserfiche WebLink
8.A. - Page 58 <br />Mitigation: Mitigation Measure Noise -1: The applicant shall incorporate the following <br />conditions in all related construction contract agreements to reduce construction <br />noise impacts: <br />• Muffle and maintain all equipment used on site. All internal combustion <br />engine -driven equipment shall be fitted with mufflers, which are in good <br />condition. Good mufflers shall result in non -impact tools generating a <br />maximum noise level of 80 dB when measured at a distance of 50 feet. <br />• Utilize Aquiet@ models of air compressors and other stationary noise <br />sources where technology exists. <br />• Locate stationary noise -generating equipment as far as possible from <br />sensitive receptors when sensitive receptors adjoin or are near a construction <br />project area. <br />• Prohibit unnecessary idling of internal combustion engines. <br />• Prohibit the use of construction workers' radios within 50 feet of adjoining <br />properties. <br />Mitigation Measure Noise -2: Construction and construction maintenance <br />activities (including grading, excavating, paving, home building, and the cleaning <br />and servicing of project vehicles or equipment) shall be limited to non -holiday <br />weekdays between 7:30 a.m. and 5:00 p.m. <br />Mitigation Measure Noise -3: All truck traffic, including the delivery of <br />materials and/or equipment to the site, will be limited to non -holiday weekday <br />hours between 7:30 a.m. and 5:00 p.m. <br />Mitigation Measure Noise -4: The applicant shall designate a Disturbance <br />Coordinator for the duration of applicant -implemented construction, and also <br />incorporate in the CC&Rs the responsibility of the Property Owners' Association <br />to designate a Disturbance Coordinator for the duration of construction until full <br />site build out is completed. The Disturbance Coordinator shall: <br />• Receive and act on complaints about construction disturbances during <br />infrastructure installation, road building, residential construction, and other <br />construction activities. <br />• Determine the cause(s) and implement remedial measures as necessary to <br />alleviate significant problems. <br />• Clearly post the allowable construction hours, his/her name, and phone <br />number(s) on a sign at each construction site. <br />• Notify area residents of construction activities, schedules, and impacts <br />through issuance of a notice to all area residents a minimum of one week <br />prior to commencement of construction activities. This notice shall explain <br />the proposed construction activities and schedule, and provide contact <br />information for the Disturbance Coordinator should any residents have <br />questions, concerns, or complaints. In the event that the construction <br />CyJ <br />