Laserfiche WebLink
APPENDIX A: MITIGATION MONITORING AND REPORTING PLAN <br />MMIlation M <br />recommendations and conditions in the approved permits at all times. The <br />permitting process will likely require compensation for impacts to wetlands. <br />Compensation could include purchase of mitigation credits for the affected <br />habitat types at an established mitigation bank, preservation and <br />enhancement of in-kind habitat types, or creation and preservation of in- <br />kind habitat types. <br />Irnpiamerntationt Monhadng Entity Implomentalion <br />Monitoring Method Schedule <br />040 <br />v <br />m <br />m <br />Mitigation Measure Biology -9: A temporary cofferdam shall be installed <br />Building, Infrastructure, <br />Building, Infrastructure, <br />Prior to building <br />upstream of the work area if the drainage is flowing during road grading, culvert <br />and Transportation <br />and Transportation <br />permit issuance <br />installation, or any construction activity involving the drainage. Water shall be <br />Department to review <br />Department <br />Department; City <br />diverted through a temporary pipe around the work area and routed back into the <br />and approve plans for a <br />construction area. Disturbed soils shall be revegetated as soon as possible with <br />consultant to review <br />drainage downstream of the work area. If necessary, a pump may be utilized to <br />cofferdam <br />timely manner to avoid soil erosion from rain or wind. The applicant shall comply <br />help displace the water. The cofferdam, pipe, and pump would be removed after <br />work is completed and the drainage would be returned to its original condition. <br />Mitigation Measure Biology -10: A Best Management Practices (BMPs) Plan <br />Building, Infrastructure, <br />shall be developed and put in place prior to the initiation of project activities. The <br />and Transportation <br />BMP Plan shall be submitted for the review and approval by City staff prior to the <br />Department to review <br />issuance of any permits for the construction of Phase I of the project. The BMPs <br />and approve BMP Plan <br />shall include silt fencing and/or straw bale barriers to be placed as necessary <br />Transportation <br />along the edge of construction activities leading to the drainage area to prevent <br />Department; City <br />particle laden runoff and wet soil sloughing from occurring outside of the <br />Attorney; and biological <br />construction area. Disturbed soils shall be revegetated as soon as possible with <br />consultant to review <br />grass or other appropriate native vegetation. Revegetation shall be performed in a <br />CC&Rs <br />timely manner to avoid soil erosion from rain or wind. The applicant shall comply <br />with all recommendations presented in the approved BMP Plan at all times. <br />Mitigation Measure Biology -11: The CC&Rs shall outline and require the <br />Planning, Housing, and <br />implementation of a periodic cleanup plan for removal of any debris buildup or <br />Economic Development <br />trash that may obstruct natural drainage flows, destroy or harm any natural habitat, <br />Department; Building, <br />or visually mar the proposed project area. <br />Infrastructure, and <br />Transportation <br />Transportation <br />Department; City <br />Attorney; and biological <br />consultant to review <br />CC&Rs <br />Building, Infrastructure, Prior to building <br />and Transportation permit issuance <br />Department <br />Planning, Housing, and <br />Prior to final <br />Economic Development <br />building permit <br />Department; Building, <br />sign off and <br />Infrastructure, and <br />occupancy of the <br />Transportation <br />first residence <br />Department; City <br />Attorney; and biological <br />consultant <br />A-10 Laurel Way Planned Development Revised Final EIR <br />February 2013 <br />