8.A. - Page 234 <br />18 -Grading is prohibited between October 1 and April 30 per Redwood City <br />and the County of San Mateo for the development of steep sites. <br />19. The development of each individual property shall be subject to the review <br />and approval of an individual Planned Development permit. The maximum <br />floor area of the proposed 16 residences shall amply with master <br />Planned Development Permit submittal, as nferenced in the following <br />table: <br />20. The new construction shall be in conformance with the Califomia Building, <br />Mechanical, Electrical, Plumbing, Energy, Green Building Codes, <br />Redwood City Green building ordinance and local amendments, in effect <br />at the time of Building Permit issuance. <br />21. The project shall meet fire flow requirements as established by the Fire <br />Department which are based on the International Fire Code. Fire flow <br />tests are typically performed during the preliminary design phase but must <br />be completed prior to submittal of final design. Applicant shall contact the <br />Fire Department for fire flow requirements, and then submit a written fire <br />flow test request to Engineering. <br />22. Applicant shall evaluate and determine whether existing water mains meet <br />the domestic and fire flow requirements in accordance with City Code <br />ATTY/RESO.2841/APPROVING THE LAUREL WAY PO PERMIT <br />REV. 03-18-13 VP <br />Page 6 of 14 <br />PW <br />MtI "Wff <br />loEiF.bla+tk10 <br />Al'6l <br />LOAM <br />gi <br />Allam9ulldiel3 <br />� <br />FlaarAraa <br />:rdraik+rx <br />4kd1@t4A <br />Lot 1% 0ladk 1B <br />057-201360 <br />106290 <br />_ <br />4,116 <br />3900 <br />Lot 17, Black 18 <br />057 -i01 -M <br />10 AN <br />q,796 <br />3900 <br />Lot 34 Block 18 <br />057401.270 <br />91650 <br />300 <br />3900 <br />Lot 13, Mack 18 <br />057-301-280 <br />8.970 <br />3586 <br />3900 <br />Lot 14, WM* 18 <br />0"-301-290 <br />8,175 <br />8,270 <br />Lot 33. Nock is <br />067-301-300 <br />7,830 <br />3432 <br />3900 <br />Lot » Block 16 <br />057-301.310 <br />4520 <br />32146 <br />Lot 1h Bloc[ 18 <br />057301320 <br />30,460 1 <br />46384 <br />45W <br />Lot 10. Block 18 <br />067 301-860 <br />a" <br />9,466 <br />3500 <br />Lot 9, Black -18 <br />057-301 70 <br />101649 <br />A,256 <br />4`W <br />Lot 8, Bbdk 18 <br />057-301-M <br />13,430 <br />5,380 <br />4S0d <br />Lot 1, BLock 17 <br />057301.810 <br />7,610 <br />a,044 <br />3340 <br />Lot 1, Bbdk 16 <br />057.301380 <br />7,650 <br />3,060 <br />3608 <br />Lot 2, Block 16 <br />057.801390 <br />7,9115 <br />9;194 <br />36M <br />Lot 3. a" 36 <br />057301-400 <br />6,375 <br />3x;50 <br />3800 <br />Lot 41 Block 38 <br />057-901-430 <br />8.545 <br />3,418 <br />3600 <br />Lot 5, Block 16 <br />057-301-420 <br />4035 <br />3„206 <br />3600 <br />Lot 8, Block 16 <br />057 301-430 <br />8,685 <br />3,414 <br />3600 <br />20. The new construction shall be in conformance with the Califomia Building, <br />Mechanical, Electrical, Plumbing, Energy, Green Building Codes, <br />Redwood City Green building ordinance and local amendments, in effect <br />at the time of Building Permit issuance. <br />21. The project shall meet fire flow requirements as established by the Fire <br />Department which are based on the International Fire Code. Fire flow <br />tests are typically performed during the preliminary design phase but must <br />be completed prior to submittal of final design. Applicant shall contact the <br />Fire Department for fire flow requirements, and then submit a written fire <br />flow test request to Engineering. <br />22. Applicant shall evaluate and determine whether existing water mains meet <br />the domestic and fire flow requirements in accordance with City Code <br />ATTY/RESO.2841/APPROVING THE LAUREL WAY PO PERMIT <br />REV. 03-18-13 VP <br />Page 6 of 14 <br />