My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2013-10-07 Closed and Regular
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2013
>
AgdaPkt 2013-10-07 Closed and Regular
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2015 5:12:48 PM
Creation date
10/3/2013 5:33:45 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
10/7/2013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
486
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
7.1.D. - Page 17 <br /> Task 2.1 -Base Mapping and Survey <br /> Subtask 2.1.1 —Base Mapping and Control Survey <br /> CONSULTANT will prepare topographic mapping in accordance with current Caltrans <br /> photogrammetric procedures (i.e. Step "A+B+C" method.). A proposed flight plan will be <br /> developed and the location of flight markers will be submitted to Caltrans for approval (Step A). <br /> Ground control surveys will be performed to lay flight markers and tie them into the state <br /> coordinate system. Results of the ground control (GPS) survey will be documented in a Survey <br /> Report and submitted to Caltrans for approval (Step B). The site will then be flown and ground <br /> control used to triangulate the mapping models. Caltrans approval of the triangulation <br /> calculations completes Step C and preparation of topographic mapping can commence. Mapping <br /> will be prepared in MicroStation format, consistent with Caltrans drafting standard at a map <br /> scale of 1:50 (English). The project area to be mapped is as shown in Figure 1 Site Map. <br /> Subtask 2.1.2—Field Survey <br /> Additional field survey work is also anticipated to locate details not clearly identified on the <br /> aerial mapping such as individual trees, and to pick up underground facilities such as drainage <br /> inlets. CONSULTANT will include right of way limits, existing horizontal control, utility and <br /> drainage facilities on the base mapping using available record data and distribute to the team. <br /> Task 2.2 -Data Collection and Review <br /> CONSULTANT will coordinate with the CITY, Caltrans, and other affected agencies to identify <br /> and collect data relevant to the project such as as-built plans, details of planned development <br /> projects affecting the project area, related technical reports, right of way/easement records, <br /> traffic and accident data, and existing utility information. The collection of data developed for <br /> the PSR and 2011 Study will also be reviewed. A database of requests will be used to track <br /> progress. <br /> Task 2.3 -Develop and Evaluate Design Alternatives <br /> This task will expand on previous studies and define alternatives in sufficient detail so that an <br /> evaluation and subsequent selection of study alternatives can be made. The alternatives will be <br /> presented to CITY and PDT staff for review and comment. Findings will be presented in the <br /> Alternatives Evaluation Report. <br /> Subtask 2.3.1 —Develop Design Alternatives <br /> CONSULTANT will define and evaluate five alternatives. Non-viable alternatives from previous <br /> studies and reasons for rejecting them will also be documented. CONSULTANT will prepare <br /> preliminary geometrics using the updated base mapping and investigate alternative <br /> configurations to achieve the most cost-effective solution with the least impact on <br /> environmentally sensitive areas and private property. Construction phasing opportunities will <br /> also be investigated (e.g. advance utility relocation, discrete functional segments to match <br /> funding goals). The alternatives will be analyzed to qualitatively compare cost, traffic operations, <br /> safety, design exceptions, environmental impacts, right of way and utility relocation <br /> requirements. <br /> ATTY/AGR/2013.164/URS PROFESSIONAL SERVICES AGR <br /> REV:09-26-13 VR <br /> Page 14 of 78 <br />
The URL can be used to link to this page
Your browser does not support the video tag.