Laserfiche WebLink
.N.£i�'ga�ion 1Vlo�aito�ing and I�eporting�'ldn <br /> from vacuum sweeping from entering the storm drain system. Wash water may be <br /> picked up by the vacuwn unit. <br /> • AIl vehicle speeds on unpaved roads shall be]lmited to 15 mph. <br /> • All roadways,drivewaps,and sidewalks to be paved sha11 be compieted as soon as <br /> possible. Foundations for the pump station,retain.itzg waZls,and pedestrian path shall be <br /> laid as soon as possible after grading unless seeding or soil binders are used. <br /> • Idling times shall be minimized either by shutting equipment off�vhen not in use or by <br /> xeducing the maximum idling time to 5 minutes,as required by the California airborne <br /> toxics control measure Tide 13, Section 24$5 of California Code of Regulations. Clear <br /> signage regarding idling time requirements shall be provided for construction workets at <br /> all access points. <br /> • All construction equipment shall be maintained and properlp tuned in accordance with <br /> the manufacturer's specafications.All equipment shall be checked by a certified visible <br /> emissions evaluator. <br /> • The Contractor shall post a pubficlp visible sign with the teiephone number and person <br /> to contact at the lead agencF regatding dust complaints.This person shall respond and <br /> take corrective action within�8 houts. The Bay Area 1Lir Qua,lity Management District's <br /> phone numbex shail a.l.so be visible to ensure compfiance with applicable regulations. <br /> Responsible Party:City of Redwood City o�Tersight <br /> BIOLOGICAL RESOURCES <br /> Mitigarion Measure BIO 1: Construction Scheduling <br /> The Contractor shall install a temporary cofferdam during low tide to Yeduce impacts to water <br /> quaiity and aquaric species. The Contractor shail schedule otl�er construction actions to avoid <br /> effects to listed species and habitats, to the extent praciical. <br /> Responsible Party: City o£Redwood City oversight <br /> Mitigatian Measure BIO 2: Pre-Cos�struction Surveys and Buffers <br /> The City shall have a quaiified biologist conduct pre-construction surveys for any endangered, <br /> special-status plant and animal species or migrator�birds 72 hours prior to the commencement of <br /> pump starion constxucrian anc�again pxior to the commencement of construction of the US 101 <br /> undercrossing project. If anp migratory bird nests are detected, the City shall establish a i�uffer <br /> around the nest unless the Caiifornia Department of Fish and Wildlife (CDFW} approves alternative <br /> measutes. Typically a 50-foot buffer shall be set around any passerine/or non-passerine nests, and a <br /> 250-foot buffer shall be set axound any raptor nest. <br /> Responsible Party: City of Redwood City <br /> Mitigation Measure BIO 3: Pre-Cvnsttuct�on Surveys for Roasting Bats <br /> The City shall have a qualified biologist conduct pre-construcrion surveys for any roosting bats prior <br /> to the commencement of any construcrion activities uader or within 100 feet of US 101 and <br /> ���! ��� �':'1 } _�l ' US 909 Pedestriara Us�dercro.rsing and <br /> 8air Island Stornr T�ater Pump Statian Project <br />