My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt13 URS Corporation
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2013
>
Agmt13 URS Corporation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2016 5:25:52 PM
Creation date
10/23/2013 10:39:57 AM
Metadata
Fields
Template:
Agreement
Contractor Name
URS Corporation
PROJECT NAME
101/84 (Woodside Road) Interchange Project Approval & Environmental Document (PA&ED)
RMP File Number
304
Date
10/22/2013
MO Ref
13-184
Amendment
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
_ . _ . _ __ <br /> area and available travel demand forecast for the existing interchange conditions and the major <br /> interchange reconfiguration. <br /> Subtask 3.4.2—Alternative Model Volumes <br /> Once there are two preferred alternatives, CONSULTANT will prepare the final travel demand <br /> volumes for the design year for each of the two alternatives. The traffic volumes will be <br /> developed from VTA model runs as well as potential manual reassignment of the volumes to <br /> reflect subtle modifications to the ramp connections that may not be reflected in the regional <br /> model volumes. <br /> Subtask 3.4.3-SimTraffic <br /> CONSULTANT will evaluate two alternatives for the design year only. CONSULTANT will <br /> prepare AM and PM SimTraffic model runs for the Woodside Corridor for each of the two <br /> alternatives using the design year volumes. The measures of effectiveness reported will include: <br /> average vehicle delay, level of service, percent of vehicles (demand) served, and vehicle <br /> queuing. For the isolated intersections, Synchro will be used to evaluate the performance of these <br /> isolated locations. Information for these intersections will include: average vehicle delay, level <br /> of service, and queuing. The performance measures for the alternatives will be compared to the <br /> performance of the existing interchange configuration(no project). <br /> Subtask 3.4.4-Alternatives Analysis Memorandum <br /> CONSULTANT will prepare a memorandum that summarizes the operational aspects of the <br /> alternative analysis including the performance measures for the existing interchange <br /> configuration and the two design alternatives. The memorandum will be submitted to PDT for <br /> use in the review of the alternatives. <br /> Task 3.5 -Bicycle/Pedestrian Traffic Operations Analysis <br /> CONSULTANT will utilize field and traffic data collected in other tasks, and supplement as <br /> necessary, to perform an analysis of pedestrian and bicycle quality of service (PBQOS) far <br /> existing conditions and up to two proposed project alternatives. Data will include, but not be <br /> limited to, the following: <br /> • Traffic volumes <br /> • Number of vehicle through lanes <br /> • Speed limit <br /> • Percent heavy vehicles <br /> • Presence and degree of separation of dedicated bike facility <br /> • Presence and type of on-street parking <br /> • Driveway conflicts <br /> • Cross street width,traffic control, vehicle turn volumes <br /> • Presence of traffic calming measures <br /> ATfY/AGR/2013.164/URS PROFESSIONAL SERVICES AGR <br /> REV:10-15-13 VR <br /> Page 28 of�8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.