Other efforts include providing support and information to the design team for the Life-Cycle <br /> Cost Analysis (LCCA) and other input on the alternatives regarding excavations, fill slopes, <br /> retaining wall decisions, and possible mitigation measures for settlement and liquefaction issues <br /> that can be expected. <br /> Task 4.9—Construction Cost Estimate and Schedule <br /> CONSULTANT will prepare a Project Report Level Cost Estimate and Schedule, in accordance <br /> with Caltrans requirements. Major construction items, quantities, unit prices, and soft costs will <br /> be identified to estimate total project costs including allowances for mobilization and <br /> contingencies (appropriate for this level of design detail). Cost variants for alternatives will be <br /> estimated, if necessary. Right-of-way and utility relocation costs will be approximated at this <br /> stage of design using available information. <br /> Task 4.10-Highway Plan Sheets <br /> CONSULTANT will develop layout plans for up to two Build Alternative(s) that indicate lane, <br /> shoulder, horizontal control, structure locations and right of way requirements in MicroStation <br /> format using the topographic base mapping prepared in Task 2. Typical cross sections and <br /> roadway profiles and superelevation diagrams of new and modified alignments will also be <br /> developed. <br /> Task 4.11 -Design Exceptions <br /> CONSULTANT will check the geometrics of the existing and proposed state facility for non- <br /> standard features and update the list of mandatory and advisory design exceptions identified <br /> previously (Task 2), if necessary. Geometric refinements will be further investigated to assess if <br /> any non-standard features can be eliminated. Fact Sheets will be drafted and submitted to <br /> Caltrans HQ geometrician and District 4 for review and comment. CONSULTANT will address <br /> any comments and submit final Fact Sheets for Caltrans approval, prior to submittal of the Draft <br /> Project Report. Mandatory design exceptions for interchange spacing, median width and <br /> shoulder width are anticipated. Traffic and accident analysis, physical constraints, cost, access <br /> control, and environmental impacts will be critical factors in justifying the design. <br /> Task 4.12 -Landscape& Aesthetics Concept <br /> CONSULTANT will prepare a technical memorandum that provides agreed upon guidance for <br /> the future development of the landscape and aesthetics elements of the project. <br /> Task 4.13—Life Cycle Cost Analysis <br /> CONSULTANT will prepare a pavement Life Cycle Cost Analysis (LCCA) far proposed ramps <br /> and any mainline work, with the results summarized in a report. LCCA will be performed per <br /> procedures and guidelines provided in the latest Caltrans Pavement Policy Bulletin (PPB 10-08). <br /> ATTY/AGR/2013.164/URS PROFESSIONAL SERVICES AGR <br /> REV:10-15-13 VR <br /> ;�age 34 of 78 <br />