My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt13 URS Corporation
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2013
>
Agmt13 URS Corporation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2016 5:25:52 PM
Creation date
10/23/2013 10:39:57 AM
Metadata
Fields
Template:
Agreement
Contractor Name
URS Corporation
PROJECT NAME
101/84 (Woodside Road) Interchange Project Approval & Environmental Document (PA&ED)
RMP File Number
304
Date
10/22/2013
MO Ref
13-184
Amendment
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Task 4.14—Final Engineering Technical Reports <br /> Technical reports will be updated based on comments received from reviewing agencies. A <br /> matrix of review comments and their responses for each report will also be compiled. <br /> Task 4 -Deliverables <br /> C� R/W Data Sheet <br /> C� Conceptual Stage Construction/Traffic Handling <br /> `� Draft Traffic Management Plan <br /> ❑ Storm Water Data Report <br /> ❑ Drainage Impact Study Report <br /> � HydroModification Memo <br /> �� Location Hydraulic Study <br /> ❑ Advance Planning Study <br /> C' Structure Preliminary Geotechnical Report <br /> ❑ Preliminary Geotechnical Report <br /> C Preliminary Cost Estimate <br /> r Preliminary Construction Schedule <br /> - Preliminary Plans <br /> `i List of Design Exceptions <br /> �' Landscape &Aesthetics Concept Memo <br /> �' Life Cycle Cost Analysis <br /> Task 5-Environmental Studies <br /> This scope of work describes preparation of an environmental document and supporting studies <br /> under the direction and review of the CITY and Caltrans. <br /> Task 5.1 —Purpose and Need <br /> CONSULTANT will prepare a draft purpose and need and an alternatives description, based on <br /> the project background information and current traffic, accident, and other related information. <br /> These include providing congestion relief due to constraints within the existing interchange, <br /> improving ramp and intersection capacity, and improving bicycle and pedestrian access. <br /> Subtask 5.1.1-Project Scoping <br /> This initial phase of the project includes a field review of the project area by approximately five <br /> URS team members assess and document existing environmental conditions. Base mapping will <br /> be prepared for field annotation of project area conditions. The field review may be combined <br /> with the kick-off ineeting described below. <br /> In addition, CONSULTANT will review previous documentation and perform early consultation <br /> with Caltrans, CITY, and other responsible or interested agencies to identify known <br /> environmental issues or conditions in the project area. Of particular interest is local <br /> ATTY/AGR/2013.164/URS PROFESSIONAL SERVICES AGR <br /> REV:10-15-13 VR <br /> Page 35�f ii's <br />
The URL can be used to link to this page
Your browser does not support the video tag.