Laserfiche WebLink
Task 4.14—Final Engineering Technical Reports <br /> Technical reports will be updated based on comments received from reviewing agencies. A <br /> matrix of review comments and their responses for each report will also be compiled. <br /> Task 4 -Deliverables <br /> C� R/W Data Sheet <br /> C� Conceptual Stage Construction/Traffic Handling <br /> `� Draft Traffic Management Plan <br /> ❑ Storm Water Data Report <br /> ❑ Drainage Impact Study Report <br /> � HydroModification Memo <br /> �� Location Hydraulic Study <br /> ❑ Advance Planning Study <br /> C' Structure Preliminary Geotechnical Report <br /> ❑ Preliminary Geotechnical Report <br /> C Preliminary Cost Estimate <br /> r Preliminary Construction Schedule <br /> - Preliminary Plans <br /> `i List of Design Exceptions <br /> �' Landscape &Aesthetics Concept Memo <br /> �' Life Cycle Cost Analysis <br /> Task 5-Environmental Studies <br /> This scope of work describes preparation of an environmental document and supporting studies <br /> under the direction and review of the CITY and Caltrans. <br /> Task 5.1 —Purpose and Need <br /> CONSULTANT will prepare a draft purpose and need and an alternatives description, based on <br /> the project background information and current traffic, accident, and other related information. <br /> These include providing congestion relief due to constraints within the existing interchange, <br /> improving ramp and intersection capacity, and improving bicycle and pedestrian access. <br /> Subtask 5.1.1-Project Scoping <br /> This initial phase of the project includes a field review of the project area by approximately five <br /> URS team members assess and document existing environmental conditions. Base mapping will <br /> be prepared for field annotation of project area conditions. The field review may be combined <br /> with the kick-off ineeting described below. <br /> In addition, CONSULTANT will review previous documentation and perform early consultation <br /> with Caltrans, CITY, and other responsible or interested agencies to identify known <br /> environmental issues or conditions in the project area. Of particular interest is local <br /> ATTY/AGR/2013.164/URS PROFESSIONAL SERVICES AGR <br /> REV:10-15-13 VR <br /> Page 35�f ii's <br />