Laserfiche WebLink
8.A. - Page 2 <br /> Although the appellant has agreed to withdraw the appeal provided certain conditions <br /> are met, the City Council still has the obligation to independently review and consider <br /> both the project as revised and the appeal. <br /> Accordingly, this staff report is organized into two sections. Section 1 is a summary of <br /> the proposed revisions to the project based on the November 8, 2013 revisions and the <br /> overall Downtown Precise Plan (DTPP) analysis. Section 2 is a discussion on the merits <br /> of the appeal and the project. <br /> SECTION 1 - DISCUSSION AND ANALYSIS OF THE 525 MIDDLEFIELD PROJECT <br /> AS REVISED <br /> I. The Proposed Project Revisions In Accordance With Agreement Between <br /> Applicant And Appellant <br /> A. Bradford Fagade Composition <br /> The following design elements are reflected in the revised design: <br /> • The building base, at the corner of Middlefield and Bradford (the San Mateo <br /> Credit Union space) would maintain a presence at the corner with the buildings <br /> pilasters built up to the property line, with recessed storefronts maintaining a <br /> twenty-five (25) foot rhythm. <br /> • The second and third story building fa�ade, directly above the San Mateo Credit <br /> Union space would maintain a four (4) foot off-set. This same four (4) foot off-set <br /> (i.e. setback) would be used for the leasing office fa�ade at the Jefferson and <br /> Bradford corner. <br /> • From the fourth through tenth story, the building face would be stepped back an <br /> additional eight feet six inches (8'6") (i.e. 12'6" from the property line). The new <br /> roof top element at the third level, where the additional stepback occurs, would <br /> be used to accommodate additional plantings that could aid in providing some <br /> visual relief to the building mass. <br /> B. Bradford and Jefferson Building Placement <br /> In order to accommodate the additional stepback for the upper floors of the Bradford <br /> building and to maintain acceptable unit sizes on the south elevation, the entire <br /> Bradford building must be shifted to the north eight feet six inches (8'6"). The parking <br /> podium would remain in its current location, but structural design of the upper floors <br /> would shift. <br /> In an effort to remain consistent with the DTPP, specifically Guideline 2.7.4.C.2.b, which <br /> states "Building levels which apply the Tower disposition type should be set back <br /> horizontally no less than 40 feet from other building masses at the same level, including <br /> those on surrounding parcels, and no less than 20 feet from side and rear lot lines. <br /> Towers do not need to be set back from streets, unless necessary to comply with <br /> Page 2 <br />