My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt13 Southland Construction
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2013
>
Agmt13 Under 60K
>
Agmt13 Southland Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/2/2013 11:12:52 AM
Creation date
12/2/2013 11:12:50 AM
Metadata
Fields
Template:
Agreement
Contractor Name
Southland Construction
PROJECT NAME
Renovation at Snadpiper Community Center 797 Redwood Shores Pkwy
RMP File Number
304.5
Date
11/27/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ii. All small holes to be filled with matching putty <br /> iii. Varathane -Crystal clear Poly Urethane-satin finish—two(2)coats required <br /> Remodel of Stora�e/Small Office Shall Include Items Listed Below At Nos. 1-4: <br /> 1. Windows <br /> a. Window coverings-TBD <br /> 2. Floors <br /> a. Remove existing carpet <br /> b. Prepare floors and provide floor seal product- Bostik Dura bond D261 epoxy <br /> c. Install new carpet squares -Interface Aiki Collection,color TBD <br /> d. Install cove base product. 4" Burke cove base(color TBD) <br /> 3. Doors <br /> a. Refinish wood doors—Varathane -Crystal clear Poly Urethane-satin finish-2 coats <br /> required <br /> i. All wood surfaces to be cleaned and prepared prior to application of product <br /> b. Door casings <br /> i. All surfaces to be thoroughly sanded and cleaned prior to primer application <br /> ii. Primer-Rustoleum Sierra Performance#S30 Grip tec acrylic primer <br /> iii. Finish—Rustoleum Sierra Performance#S37 Metalmax DTM Acrylic <br /> Enamel—(color TBD) <br /> c. Smoke seal <br /> i. Remove existing smoke seals <br /> ii. Install mechanically fastened smoke seal after painting is complete <br /> 4. Walls <br /> a. Paint—Kelly Moore-Durapoxy-product 1686-14 -Frost <br /> Remodel of Staff Room/Lar�e Office Shall Include Items Listed Below At Nos. 1-5: <br /> 1. Windows <br /> b. Window coverings-TBD <br /> Page 14 of 19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.