Laserfiche WebLink
2. Floors <br /> a. Remove existing carpet <br /> b. Prepare floors and provide floor seal product-Bostik Dura bond D261 epoxy <br /> c. Install new carpet squares -Interface Aiki Collection,colar TBD <br /> d. Install cove base Burke cove base(color TBD) <br /> 3. Doors <br /> a. Refinish wood doars—Varathane -Crystal clear Poly Urethane-satin finish-2 coats <br /> required � <br /> i. All wood surfaces to be cleaned and prepared prior to application of product <br /> b. Doar casings <br /> i. All surfaces to be thoroughly sanded and cleaned priar to primer application <br /> ii. Primer-Rustoleum Sierra Performance#S30 Grip tec acrylic primer <br /> iii. Finish—Rustoleum Sierra Performance#S37 MetalmaaL DTM Acrylic <br /> Enamel—(color TBD) <br /> c. Smoke seal <br /> i. Remove existing smoke seal <br /> ii. Install mechanically fastened smoke seal after painting is complete <br /> 4. Tall Storage <br /> a. Add 3 -18"x36"x84"tall storage units—(same style and design as activity room detail <br /> D) <br /> b. Toe kick and base to be included <br /> c. These new units are to be attached to the wall to ensure seismic stability. <br /> 5. Walls <br /> a. Paint—Kelly Moore-Durapoxy-product 1686-14 -Frost <br /> Warrantv To Be Provided bv Contractor: <br /> Contractor agrees that new equipment and materials are covered by the installing Contractar's material <br /> and workmanship warranty for one (1) year after City's acceptance. The Contractor shall be responsible <br /> for providing maintenance and replacement covered by the warranty. Upon expiration of the warranty, <br /> equipment and materials will be treated in accordance with any other City owned or City managed asset. <br /> No additional, or separate, compensation shall be paid by City to Contractar for warranty service work or <br /> warranty materials provided by Contractor to City. <br /> � <br /> Page 15 of 19 <br />