My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt13 Southland Construction
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2013
>
Agmt13 Under 60K
>
Agmt13 Southland Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/2/2013 11:12:52 AM
Creation date
12/2/2013 11:12:50 AM
Metadata
Fields
Template:
Agreement
Contractor Name
Southland Construction
PROJECT NAME
Renovation at Snadpiper Community Center 797 Redwood Shores Pkwy
RMP File Number
304.5
Date
11/27/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
2. Floors <br /> a. Remove existing carpet <br /> b. Prepare floors and provide floor seal product-Bostik Dura bond D261 epoxy <br /> c. Install new carpet squares -Interface Aiki Collection,colar TBD <br /> d. Install cove base Burke cove base(color TBD) <br /> 3. Doors <br /> a. Refinish wood doars—Varathane -Crystal clear Poly Urethane-satin finish-2 coats <br /> required � <br /> i. All wood surfaces to be cleaned and prepared prior to application of product <br /> b. Doar casings <br /> i. All surfaces to be thoroughly sanded and cleaned priar to primer application <br /> ii. Primer-Rustoleum Sierra Performance#S30 Grip tec acrylic primer <br /> iii. Finish—Rustoleum Sierra Performance#S37 MetalmaaL DTM Acrylic <br /> Enamel—(color TBD) <br /> c. Smoke seal <br /> i. Remove existing smoke seal <br /> ii. Install mechanically fastened smoke seal after painting is complete <br /> 4. Tall Storage <br /> a. Add 3 -18"x36"x84"tall storage units—(same style and design as activity room detail <br /> D) <br /> b. Toe kick and base to be included <br /> c. These new units are to be attached to the wall to ensure seismic stability. <br /> 5. Walls <br /> a. Paint—Kelly Moore-Durapoxy-product 1686-14 -Frost <br /> Warrantv To Be Provided bv Contractor: <br /> Contractor agrees that new equipment and materials are covered by the installing Contractar's material <br /> and workmanship warranty for one (1) year after City's acceptance. The Contractor shall be responsible <br /> for providing maintenance and replacement covered by the warranty. Upon expiration of the warranty, <br /> equipment and materials will be treated in accordance with any other City owned or City managed asset. <br /> No additional, or separate, compensation shall be paid by City to Contractar for warranty service work or <br /> warranty materials provided by Contractor to City. <br /> � <br /> Page 15 of 19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.