My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt13 Southland Construction
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2013
>
Agmt13 Under 60K
>
Agmt13 Southland Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/2/2013 11:12:52 AM
Creation date
12/2/2013 11:12:50 AM
Metadata
Fields
Template:
Agreement
Contractor Name
Southland Construction
PROJECT NAME
Renovation at Snadpiper Community Center 797 Redwood Shores Pkwy
RMP File Number
304.5
Date
11/27/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
c. Sinks <br /> i. Under-mount—304 18/8 gauge stainless steel—Match existing size and layout <br /> ii. Faucet—Chicago model#1100-G2E3-317AB <br /> iii. Drinking fountain—Chicago model#748-665ABCP <br /> iv. Replace angle stop at all sinks and fountains with'/4 turn type stops by Brass <br /> Craft. <br /> d. Countertops <br /> i. Match existing footprint size <br /> ii. Countertop—CesarStone Classico with radius edge and 2"typical bullnose <br /> (color TBD) <br /> iii. Include CesarStone Classico backsplash-full height to bottom of upper <br /> cabinets <br /> 2. Children's Cubbies- See detail B on drawings provided at pre-bid walk <br /> a. Countertop <br /> i. Match existing footprint size <br /> ii. Countertop—Formica(color and product TBD)with radius edge , <br /> iii. Include 6"backsplash <br /> b. Reface cubby edges <br /> i. Remove existing facing and prepare surface for new facing <br /> ii. Reface using rigid vinyl Formica with"grip"adhesive/contact cement.Use <br /> Formica trimmer to ensure smooth edges.No iron on applications or <br /> substitution adhesives <br /> 3. Storage cabinets—See detail C on drawings provided at pre-bid walk <br /> a. Doors <br /> i. Remove existing doors and hardware <br /> ii. Salvage old locks for reuse by owner <br /> iii. Provide and install New locks to be keyed alike throughout <br /> iv. Provide and install white matte finish double-doors to match existing <br /> v. New doors are to be Solid ply construction <br /> 1. Double-doors combined-3'-2 '/2"wide by 3'-9 '/2"tall <br /> 2. Three(3)Euro-hinges per door <br /> Page 9 of 19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.