My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt04 Bottom Duvivier
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2004
>
Agmt04 Under $60K
>
Agmt04 Bottom Duvivier
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2008 4:41:52 PM
Creation date
4/2/2004 11:22:53 AM
Metadata
Fields
Template:
Agreement
Contractor Name
Bottom Duvivier
PROJECT NAME
Community Activities Building (CAB) - design services
RMP File Number
304.5
Date
3/24/2004
Box
6585
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. ' II I 'II <br />City of Redwood City <br />1400 Roosevelt Avenue Renovation <br />December 9,2003 <br />Pre-Design <br />We will work with City of Redwood City staff to obtain existing documents for 1400 Rooseveit, as this <br />wiii minimize the cost of our services in creoting permit and construction documents. <br />We will review the existing POT, path of travel, and document in non-graphic, written form our <br />observations of those buiiding components, which are subject to certification of compliance or non- <br />complionce. This will provide a basis for assessing the extent of non-compliance and estimating which <br />project expenditures wiii be devoted to accessibility upgrade priorities. <br />Shouid we confirm that this is not a requirement for permit review of City projects, we will deiete this <br />scope from our proposal. <br />The Process <br /> A site review to document physical dimensions and accessibiiity barrier compiiance from site <br /> entry to each building component. <br />The Deliverables <br /> A written report on the POT, this wiii be a concise report documenting those eiements of the POT <br /> which may require upgrade. <br />Schematic Design and Design Development <br />Assuming the use of existing documents, we wiii prepare a 1/8" key pian and 1/4" scope of work plan. <br />We'ii use these plans to represent extent of finishes and to sketch our proposed update of the <br />restrooms. <br />We wiii create two coior palettes of appropriate materiais. in each paiette we wiii provide you with <br />options for coior. pattern and manufacturer. <br />The materiais to be presented include: <br /> fioor finishes <br /> a corridor waii covering <br /> waii paint coiors <br /> a paint coior for the existing acoustic tiie ceilings <br /> a restroom FRP panei coior <br /> an add alternate carpet for multi-purpose rooms <br /> a paint color re-using existing toiiet partitions <br /> an add aiternate for new toilet partitions <br />The <br /> Present our initial coior palettes and sketch plans for your review and comment. <br /> Page 2 of 2 <br /> . <br />
The URL can be used to link to this page
Your browser does not support the video tag.