My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt13 Redwood City Partners, LLC Dewatering License
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2013
>
Agmt13 Redwood City Partners, LLC Dewatering License
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2013 9:59:45 AM
Creation date
12/17/2013 9:55:00 AM
Metadata
Fields
Template:
Agreement
Contractor Name
Redwood City Partners, LLC
PROJECT NAME
License for use of City poperty for Dewatering. relates to DDA 950 Middlefield Rd. Project.
RMP File Number
609
Date
12/12/2013
MO Ref
13-175
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Groundwater VOC and Fuel General Permit ORDER NO.R2-2012-0012 <br /> NPDES NO.CAG912002 <br /> Antimony Discharger may use this <br /> Beryllium Not Required method and submit results <br /> Thallium (unless identified in influent, u,ith application for permit <br /> effluent,or receiving water <br /> Pollutants by U.S.EPA reissuance,unless data <br /> Methods 601,602,608,610, monitoring table�)� submitted by CDF/EDF <br /> 614,624,and 625 But Encouraged u load <br /> Not Required <br /> Analytical Method (Discharger may select"data <br /> unavailable" ��� <br /> Collection Time Not Required <br /> Anal sis Time (Discharger may select <br /> Y "0:00" ��� <br /> Notes for Table E-3: <br /> [I] The Discharger shall continue to monitor at the minimum frequency specified in the moniroring tables,keep records of the measurements, <br /> and make the records available upon request. <br /> [2] These parameters require EDF/CDF data upload or manual entry regardless of whether monitoring is required by this Monitoring and <br /> Reporting Program or other provisions of this Order(except for biosolids,sludge,or ash provisions). <br /> 3. Monitoring periods and reporting for all required monitoring shall be completed according to <br /> the following schedule: <br /> Table E-4.Monitorin Periods and Re ortin Schedule <br /> Sampling Monitoring Period Begins On... Monitoring Period <br /> Fre uenc <br /> Continuous Effective startup date All <br /> (Midnight through 11:59 PM)or <br /> Daily Effective startup date any 24-hour period that <br /> reasonably represents a calendar <br /> day for purposes of sampling. <br /> Effective startup day through <br /> Weekly Effective startup date one week after Effective startup <br /> date <br /> First day of calendar month following the 1S`day of calendar month <br /> Monthly last day of the startup date through last day of calendar <br /> month <br /> January 1 through March 31 <br /> Closest of January 1,April 1,July 1,or April 1 through June 30 <br /> Quarterly October 1 following(or on)the last day of July 1 through September 30 <br /> the startup date <br /> October 1 through December 31 <br /> Semiannually Closest of January 1 or July 1 following(or January 1 through June 30 <br /> on)the last day of the startup date July 1 through December 31 <br /> Annually January 1 following(or on)the last day of January 1 through December 31 <br /> the start-up date <br /> 4. The Discharger shall report with each sample result the applicable Reporting Level(RL)and <br /> the current Method Detection Limit(MDL),as determined by the procedure in 40 CFR Part <br /> 136. The Discharger shall report the results of analytical deternunations for the presence of <br /> chemical constituents in a sample using the following reporting protocols: <br /> a. Sample results greater than or equal to the RL shall be reported as measured by the <br /> laboratory (i.e., the measured chemical concentration in the sample). <br /> b. Sample results less than the RL, but greater than or equal to the laboratory's MDL, shall <br /> Attachment E—Monitoring and Reporting Program E-11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.