My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2014-01-13 Interview, Closed and Regular
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2014
>
AgdaPkt 2014-01-13 Interview, Closed and Regular
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2014 8:33:06 AM
Creation date
1/9/2014 9:29:21 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Regular
Agency Type
City Council
Date
1/13/2014
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
543
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
7.1.F. - Page 19 <br /> wet stamped and signed construction documents will be provided to the City for bidding <br /> purposes. <br /> Task 4 is divided into six subtasks to identify each project deliverable. The subtasks include the <br /> following: <br /> Task 4 -1 100% Drawings and Trenchless Calculations <br /> Task 4 -2 100% Specifications <br /> Task 4 -3 Opinion of Probable Cost <br /> Task 4 -4 Final Plans and Specifications (based on City 100% comments) <br /> Task 4 -5 Revised Opinion of Probable Cost (based on City input) <br /> Task 4 -6 Caltrans Permit <br /> Task 4 Deliverables: <br /> • 100% plans and specifications, one hard copy of the full -size plans (on translucent bond) <br /> will be provided to Redwood City for final mark review and approval, and one bound <br /> hard copy of the specifications. <br /> b Final plans and specifications, one hard copy of the full -size wet stamped and signed <br /> polyester media of the plans will be provided to Redwood City with the finalized <br /> specifications suitable for reproduction. <br /> ® Electronic copies: Drawings in AutoCAD version 2013 or earlier, Drawings in 11" x 17" <br /> PDF Format, specifications in Word, and estimate of probable cost and construction <br /> schedule in Excel. <br /> Task 4 City Assistance: <br /> • Set up contract with and pay for a plan room to distribute construction .documents during <br /> bidding phase identified in Task 5, <br /> Task 5 Bidding and Construction Support Services <br /> The following tasks will be conducted during the bidding and construction phases. <br /> Task 5 - 1 Bidding Support Services <br /> Consultant will assist the City during project bidding to provide clarifications, answer questions <br /> from prospective bidders, and issue addenda, as needed. <br /> Task 5-2 Prepare and Conduct Pre - Bid Meeting <br /> Consultant's Project Manager and tunneling subconsultant will jointly prepare and conduct the <br /> pre -bid meeting. An agenda for this meeting will be submitted to the City's Project Manager in <br /> advance to solicit comments. The meeting is assumed to required three (3) hours, including <br /> travel. <br /> REV: 12 -05 -13 VR <br /> Page 16 of 18 <br /> ATTY /AO 8.2013, 2401Ken nedyJ e n ks_237900 <br />
The URL can be used to link to this page
Your browser does not support the video tag.