Task 1-2 includes a concept and criteria review prior to preparation of the 75% deliverables. <br /> This activity will involve a single three (3) hour meeting in which senior staff will review the <br /> design concepts. Minutes from this meeting will be supplied to the Consultant Project team. <br /> Task 1-3 Project Kick-off Meeting <br /> Consultant will prepare the agenda and lead the project kick-off meeting, and wiU prepare <br /> minutes for distribution to meeting attendees. The consultant will also prepare agendas and <br /> minutes for monthly and progress review meetings attended by the project team and the City. <br /> Task 1 Deliverables: <br /> � Monthly status reports including invoicing, budget status, schedule updates and list of <br /> issues that need to be addressed to proceed with the project, in electronic PDF format. <br /> • Meeting agendas and meeting notes in hard copy or electronic PDF format, as needed. <br /> Task 2 Pre Design Evaluation <br /> It is recognized by the Consultant that a Pre Design Report has been completed for this praject. <br /> Since that work was done by others, the Consultant will conduct a review of the assumptions <br /> and recommendations presented in that report prior to conducting Initial Design (Task 3) and <br /> Final Design (Task 4). The following subtasks will be completed as part of the evaluation of the <br /> existing Pre Design Report. <br /> Task 2-1 Pre Design Report Review <br /> Consultant will review the assumptions, findings, and recommendations in the existing Pre <br /> Design Report. This information will be compared to Consultant's information and knowledge of <br /> upcoming improvements currently in planning or under construction at the west end of Maple <br /> Street. <br /> Task 2-2 Develop Final Design Approach Recommendations <br /> Task 2-2 will involve senior staff in the development of final design recommendations. Issues to <br /> be considered will include tunneling method and alignment for the new Walnut Street <br /> Interceptor. These recommendations are intended to form the basis for the final design. <br /> Activities under this task are expected to include: <br /> • Review and evaluation of north and south alignments across Highway 101 for the <br /> proposed Walnut Street Interceptor, <br /> • Review and evaluation of the anticipated impact to the existing 48-inch Walnut Street <br /> Gravity sewer Interceptor crossing Highway 101, <br /> • Review and evaluation af anticipated impac# to existing utilities from the installation of <br /> the new Walnut Street Interceptor. This evaluation is expected to include identifying <br /> possible approaches for the protection of SBSA's 48-inch force main near the east right- <br /> of-way line of Highway 101, in the alignment of the proposed Walnut Street Interceptor, <br /> REV: 12-05-13 VR <br /> Page 11 of 18 <br /> ATTY/AG R.2013.240/Ke n nedyJ e n ks_237900 <br />