My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt14 Kennedy/Jenks Consultants
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2014
>
Agmt14 Kennedy/Jenks Consultants
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2016 5:30:31 PM
Creation date
1/23/2014 2:37:38 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Kennedy/Jenks Consultants
PROJECT NAME
Project management of Walnut St Interceptor upgrade to a parallel 60" diameter pipeline.
RMP File Number
304
Date
1/23/2014
MO Ref
14-008
Amendment
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• Review and evaluation of conflicts between proposed Walnut Street Interceptor and <br /> SBSA's propased 48-inch force main improvements in Maple 8treet, <br /> • Review and evaluation of potential conflict with access and parking for the women's <br /> correctional facility across from the Maple Street Pump Station, <br /> • Review of existing soils data and development of an opinion regarding the suitability of <br /> soils for specific tunneling methods,(i.e open shield pipe jacking vs. microtunneling), <br /> • Review and evaluation of available lining systems for the new Walnut Street Interceptor <br /> pipe that can reduce corrosion extend the useful life of a concrete pipe desired for the <br /> crossing, and <br /> • Production of a Project Risk Register, which identifies risks and possible avoidance or <br /> mitigating measures to be incorporated into the final design. <br /> Task 2-3 Design Approach Workshop <br /> Consultant will conduct a Design Approach Workshop with the City. This workshop will be <br /> facilitated by the Consultant's Project Manager and will include key team members from #he <br /> geote.chnical and tunneling subconsultanfs. The workshop will rely on the infbrmation generated <br /> in Task 2-2 to establish the agenda. Outcomes of the workshop will involve confirmation of the <br /> design criteria, and agreement on the approach for design. The workshop is assumed to require <br /> three(3)hours, including travel. <br /> Task 2-4 Prepare a Pre Design Report Supplement <br /> Consultant will prepare a Pre Design Report Supplement based on deliverables generated in <br /> Tasks 2-2 and 2-3. The Pre Design Report Supplement will include the following: <br /> • Draft schedule featuring coordination between Redwood City and SBSA, <br /> + Opinion of soil conditions and their impact on tunneling method, <br /> • Measures required to protect the existing 48-inch Walnut Street Gravity Interceptor <br /> crossing Highway 101 and the SBSA 48-inch force main paralleling the east right-of-way <br /> line of Highway 101, <br /> • Results from discussions with Caltrans concerning existing pipeline records and <br /> allowance for advancement of a 60-inch concrete product pipe without a casing, <br /> • Completed Risk Register, <br /> • Identification of mitigation for impact to the County Women's Correctional Center from <br /> construction, and <br /> � Preferred alignment, presented in a 30°/a design sketch format, <br /> • Preferred tunneling method, presented in a 30°/a sketch format with supporting text, <br /> • List of Specifications. <br /> REV:12-05-13 VR <br /> Page 12 of 18 <br /> ATTY/AGR.2013.240/KennedyJenks_237900 <br />
The URL can be used to link to this page
Your browser does not support the video tag.