My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt14 Kennedy/Jenks Consultants
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2014
>
Agmt14 Kennedy/Jenks Consultants
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2016 5:30:31 PM
Creation date
1/23/2014 2:37:38 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Kennedy/Jenks Consultants
PROJECT NAME
Project management of Walnut St Interceptor upgrade to a parallel 60" diameter pipeline.
RMP File Number
304
Date
1/23/2014
MO Ref
14-008
Amendment
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
estimate of probable construction cost; listing of required permits and easements; and a utility <br /> conflict log,with accompanying utility notification letter per Redwood City Standards. <br /> Task 2 Deliverables: <br /> • Draft and Final Pre Design Report Supplement, <br /> • Risk Register, and <br /> • Utility notification letter <br /> Task 3 initial Design (75% Submittal) <br /> Task 3 will include the development of the 75% design documents consisting of drawings, <br /> specifications, design calculations and an opinion of probable cost. Documents for the 75% <br /> submit#al will be prepared based on design information obtained during the Pre Design Report <br /> Evaluation (see Task 2), as well as from City review and comments on the Pre Design Report <br /> Supplement and the accompanying conceptual design documents. The 75% documents will <br /> confirm permanent and temporary easements, utility conflicts and any necessary utility <br /> relocations, erosion control and stabilization requirements, pipeline connections, tunneling <br /> layout, staging areas,jacking and exit shafts and res#oration requirements. <br /> The Task 3 design phases are broken down into three subtasks for the design deliverables and <br /> they include the following: <br /> Task 3-� 75% Drawings <br /> Task 3-2 75°/a Specifications <br /> Task 3-3 75% Opinion of Probable Cost <br /> Consultant will prepare updated base mapping for the alignment starting with digital field survey <br /> information (from Consultant's surveyar) and existing mapping provided by the City. These <br /> materials will form the basis for development of the drawing submittals. <br /> During the 75% design document preparation the consultant will hold weekly coordination <br /> meetings with the design team fo keep the project team up to date on the latest developments <br /> on the project and coordinate the work load. <br /> 75% Design submittal will include: <br /> � Plans - demolition, site grading and piping, plan and profile drawings, general and <br /> construction notes, connection and structural details, location of jacking and receiving <br /> shafts, temporary construction easements, utility locations and possible staging areas: <br /> � Specifications-contract requirements, technical specifications and utility contacts. <br /> • Design calculations <br /> • Engineer's estimate of probable cost <br /> REV: 12-05-13 VR <br /> Page 14 of 18 <br /> ATTY/AG R.2013.240/KennedyJenks_237900 <br />
The URL can be used to link to this page
Your browser does not support the video tag.