My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt14 Kennedy/Jenks Consultants
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2014
>
Agmt14 Kennedy/Jenks Consultants
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2016 5:30:31 PM
Creation date
1/23/2014 2:37:38 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Kennedy/Jenks Consultants
PROJECT NAME
Project management of Walnut St Interceptor upgrade to a parallel 60" diameter pipeline.
RMP File Number
304
Date
1/23/2014
MO Ref
14-008
Amendment
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
wet stamped and signed construction documents will be provided to the City for bidding <br /> pu rposes. <br /> Task 4 is divided into six subtasks to identify each project deliverable. The subtasks include the <br /> foliowing: <br /> Task 4-1 100% Drawings and Trenchless Calculations <br /> Task 4-2 100% Specifications <br /> Task 4-3 Opinion of Probable Gost <br /> Task 4-4 Final Plans and Specifications (based on City 100% comments) <br /> Task 4-5 Revised Opinion of Probable Cost(based on City input) <br /> Task 4-6 Galtrans Permit <br /> Task 4 Deliverables: <br /> • 100% plans and specifications, one hard copy of the full-size plans (on translucent bond) <br /> will be provided to Redwood City for final mark review and approval, and one bound <br /> hard copy of the specifications. . <br /> • Final plans and specifications, one hard copy of the full-size wet stamped and signed <br /> polyester media of the plans will be provided to Redwood City with the finalized <br /> specifications suitable for reproduction. <br /> • Electronic copies: Drawings in AutoCAD version 2013 or earlier, Drawings in 11" x 17" <br /> PDF Format, specifications in Word, and estimate of probable cost and construction <br /> schedule in Excsl. <br /> Task 4 City Assistance: <br /> • Set up eontract with and pay for a plan room to distribute construction documents during <br /> bidding phase identified in Task 5. <br /> Task 5 Bidding and Construction Support Services <br /> The following tasks will be conducted during the bidding and construction phases. <br /> Task 5-1 Bidding Support Services <br /> Consultant will assist the City during project bidding to provide clarifications, answer questions <br /> from prospective bidders, and issue addenda, as needed. <br /> Task 5-2 Prepare and Conduct Pre-Bid Meeting <br /> Consultant's Project Manager and tunneling subconsultant will jointly prepare and conduct the <br /> pre-bid meeting. An agenda for this meeting will be submitted to the City's Project Manager in <br /> advance to solicit comments. The meeting is assumed #o r�quired three (3) hours, including <br /> travel. <br /> REV: 12-05-13 VR <br /> Page 16 of 18 <br /> ATTY/AG R.2013.240/Ken nedyJen ks_237900 <br />
The URL can be used to link to this page
Your browser does not support the video tag.