7.1.A. - Page 42 <br /> construction activities would be provided and, if required, alternative temporary locations for these <br /> activities may be needed.The project would not increase demand for any recreational facilities. <br /> 15. TRANSPORTATION/TRAFFIC. Would the project: <br /> Less Than <br /> Significant <br /> Potentially with Less Than <br /> Significant Mitigation Significant No <br /> Impact Impact Impact Impact <br /> a. Cause an increase in traffic which is substantial in <br /> relation to the existing traffic load and capacity of the <br /> street system (i.e. result in substantial increase in x <br /> either the number of vehicle trips,the volume to <br /> capacity ratio on roads, or congestion at intersections)? <br /> b. Exceed, either individually or cumulatively, a level of <br /> service standard established by the County congestion x <br /> management agency for designated roads or highways? <br /> c. Result in a change in air traffic patterns, including <br /> either an increase in traffic levels or a change in <br /> location that results in substantial safety risks? <br /> d. Substantially increase hazards due to a design feature <br /> (e.g., sharp curves or dangerous intersections)or <br /> incompatible uses (e.g.,farm equipment)? <br /> e. Result in inadequate emergency access? x <br /> f. Result in inadequate parking capacity? x <br /> g. Conflict with adopted policies, plans, or programs <br /> supporting alternative transportation (e.g., bus x <br /> turnouts, bicycle racks)? <br /> ANALYSIS: Most of the proposed pipelines will be constructed within travel lanes of existing roadways. <br /> At water body crossings, the pipelines will be placed within existing or proposed bridge structures (e.g., <br /> Blomquist Bridge). U.S.101 will be crossed either by placing the pipeline in an existing utility tunnel that <br /> runs underneath the highway, or by boring and jacking the pipe underneath the highway. The project <br /> will not result in permanent new trips being added to the roadway network; thus, this section analyzes <br /> temporary construction-related traffic impacts of the project. In addition, the project would have no <br /> effect on air traffic patterns. Design of roadways would not be altered by the project, so no impact <br /> associated with roadway design features would result from construction. <br /> Construction-Related Traffic/Circulation Impacts - The roadways in which the pipelines would be <br /> placed range from multi-lane collector streets to 2-lane local streets. Traffic volumes on these <br /> streets vary significantly, as do the levels of service (LOS) at key intersections along them. <br /> Construction-related transportation impacts can occur on all road sections regardless of the traffic <br /> volumes. However, the extent of impacts will be greater on streets with higher traffic volumes. In <br /> 28 <br />