Laserfiche WebLink
7.1.A. - Page 45 <br /> a low number of construction-related vehicle trips; these are not considered significant, and no <br /> mitigation is required. <br /> Bus Transit Service — The project area is served by bus and Caltrain rail transit service. Some bus <br /> routes run along proposed pipeline construction routes. Bus stops may occasionally be unavailable <br /> during construction activity, and coordination with the San Mateo County Transit District (SamTrans) <br /> would be required to locate temporary stops, and to provide appropriate signing and no parking <br /> signs as appropriate. No closures at this time appear to be required that would result in bus detours. <br /> Should such detours be required, coordination with SamTrans will be required. <br /> Rail Transit — The pipeline route currently includes one crossing of the Caltrain route in the <br /> downtown area of Redwood City. Caltrain has frequent passenger rail activity. This crossing will be <br /> constructed using the bore-and-jack method, to avoid surface disruption of rail service. <br /> Bicycle and Pedestrian Circulation — Many bicycle routes/lanes and pedestrian sidewalks run along <br /> proposed pipeline construction routes. These facilities may need to be temporarily closed and <br /> rerouted during construction. If this were to occur, the routes would be posted one week in advance <br /> noticing the temporary removal of the bike lane/route and/or closure of the sidewalk, notice the <br /> closure with on-street signs, and clearly signing a detour route. Where the sidewalks are on a walk- <br /> to-school route, signing will be provided to guide students along a detour route. The TMP will <br /> address bicycle and pedestrian circulation plans. <br /> 16. ULTILITIES AND SERVICE SYSTEMS. Would the project: <br /> Less Than <br /> Significant <br /> Potentially with Less Than <br /> Significant Mitigation Significant No <br /> Impact Impact Impact Impact <br /> a. Exceed wastewater treatment requirements of the <br /> applicable Regional Water Quality Control Board? X <br /> b. Require or result in the construction of new water or <br /> wastewater treatment facilities or expansion of existing <br /> facilities,the construction of which could cause <br /> significant environmental effects? <br /> c. Require or result in the construction of new storm <br /> water drainage facilities or expansion of existing <br /> facilities,the construction of which could cause X <br /> significant environmental effects? <br /> d. Have sufficient water supplies available to serve the <br /> project from existing entitlements and resources, or are <br /> new or expanded entitlements needed? <br /> 31 <br />