My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt14 Wood Rodgers, Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2014
>
Agmt14 Wood Rodgers, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2014 12:09:51 PM
Creation date
2/24/2014 12:09:45 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Wood Rodgers, Inc.
PROJECT NAME
Storm system modeling and planning services for Eastern Low-lying area
RMP File Number
304
Date
2/20/2014
MO Ref
14-026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Compile Data <br /> Consultant shall structu�e and base the Master Plan database development on the above listed and <br /> completed projects,which are consistent with ArcHydro schemas. <br /> Deliverable:Database with Existing Data. <br /> Schedule: to be completed by April 18,2014 <br /> 2. Field Surveys&Flaw Monitaring <br /> Field Visits <br /> Consultant shall conduct field visits of the five watersheds and take photographs and prepare a log of the <br /> flows? Consuitant shall document the Field Visits in the database. <br /> Deliverable:Documented Field Visits. <br /> Schedule: to be completed by May 15,2014. <br /> Field Surveys <br /> Consultant shall conduct field surveys consisting of a measurement of the pipe depth from the manhole rim. <br /> If required by City, Consuitant shall conduct a supplementary ground controfled survey (GPS), based on the <br /> certainty of the manhole rim elevations.Consultant shall survey approximately 82 manholes.Consultant shall <br /> enter all this data into the database. Consultant shall review any as-built records to verify the location and <br /> alignment,size,invert elevations,structures,etc.against available field and aerial surveys. <br /> Deliverable:Database with survey data for manholes/pipes. <br /> Schedule: to be completed by May 15,2014. <br /> Flow Monit�ring <br /> Consultant shall install self-contained water-level recorders at two different locations within Redwood City to <br /> m�onitor flows over a single wet season. One station shall be located upstream of one of the pump station <br /> inflows (either the Maple or the Bradford Pump Station), and one station shall be located in a separate <br /> enclosed storm water culvert to monitor Redwood Creek. Consultant shall prepare a short memo to <br /> accompany the data submittal. <br /> Deliverable:Two Stream flow Gages with Tech Memo. <br /> Schedule: to be completed by May 15,2014. <br /> Task 3: Hydrologic and Hydraulic Model <br /> 2. Document Criteria <br /> Consultant shaU review existing hydrologic and hydraulic criteria of past studies. Consultant shall work closely <br /> with the City to identify where additional or modified criteria may be necessary for use in planning and <br /> design. Consultant shall clearly document the additional criteria and include it in the final study report. <br /> Deliverable:Criteria. <br /> Schedule: to be completed by April 11,2014. <br /> REV:O1-15-14 JS <br /> Page 11 of 18 <br /> ATTY/AGR.2014.007/Wood Rodgers Storm Plan <br />
The URL can be used to link to this page
Your browser does not support the video tag.