My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt14 Wood Rodgers, Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2014
>
Agmt14 Wood Rodgers, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2014 12:09:51 PM
Creation date
2/24/2014 12:09:45 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Wood Rodgers, Inc.
PROJECT NAME
Storm system modeling and planning services for Eastern Low-lying area
RMP File Number
304
Date
2/20/2014
MO Ref
14-026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
directly linked to conduits and open channels in the model hydraulics component. Once model stability for ' <br /> extreme events is assured, Consultant shall run the modei for the full suite of design storms with detailed <br /> representation of system tail water conditions. Develop ZD Existing Condition Floodplain Model: <br /> The interior model will include the infrastructure identified in Table 1 below: <br /> Table Z lnterior Modellnfrastructcrre Included � <br /> Price O.q 1.5 14 <br /> Veterens 0.0 1.5 12 ' <br /> Bradfard �.0 2.0 26 <br /> t7ddstadt 0.0 1.4 14 <br /> Maple and Kmar[ 0.3 1.5 14 <br /> Redwood Creek 0.8 0.3 2 <br /> TOTAI.: 1.1 8.2 82 <br /> Deve{op Tidal/Boundary Condition Model Component: Consultant shall develop open channei hydraulic <br /> models for reaches of K-Mart, Redwood Creek, and the channel along 101 and 81air Island from the Bay to <br /> the end points. <br /> Develop Tidai Boundary Conditions. FEMA is developing a new regional South Bay 2D model. DHf has been <br /> brought on the team so that the most recent version of this model can be utilized for development of the <br /> tidal still water elevations. Consultant shall use the most recent version of the South Bay 2D model to <br /> develop tidal still water elevations. <br /> Ca(ibration:Consultant shall place a recording gage at the following locations: <br /> 1. In interior pipes upstream of either the Maple or Bradford Pump Station <br /> 2. In Redwood Creek underground pipe upstream of Bradford Pump Station <br /> Consultant shall use Data from the gages in the first significant storm of the season to calibrate the <br /> hydrologic parameters. The first gage will help calibrate interior system models, and the second will be used <br /> to calibrate the Redwood Creek hydrology in the tidal/boundary condition model. Doppler RADAR data for <br /> the selected storm will be collected and used as inpwt to the calibration model. Consultant shall collect and <br /> compile the Doppler RADAR and gage-adjust with a resolution of 1 square kilometer, at 5 minute increments. <br /> The gage adjusting is done with local on the ground precipitation data to calibrate the RADAR depths to <br /> actual depths. <br /> Deliverable: Calibrated Interior H&H Model of Five Watersheds, Linked to Calibrated Boundary Condition <br /> Model. <br /> Schedule: to be completed by July 31,2014. <br /> REV:O1-15-1415 <br /> Page 13 of 18 <br /> ATTY/AGR.2014.007/Wood Rodgers Storm Plan <br />
The URL can be used to link to this page
Your browser does not support the video tag.