My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt14 Wood Rodgers, Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2014
>
Agmt14 Wood Rodgers, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2014 12:09:51 PM
Creation date
2/24/2014 12:09:45 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Wood Rodgers, Inc.
PROJECT NAME
Storm system modeling and planning services for Eastern Low-lying area
RMP File Number
304
Date
2/20/2014
MO Ref
14-026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
4, Define De€iGiencies <br /> Consuitant shall establish Criteria for deficiencies. Once the criteria are set, the modeis can be used to <br /> identify deficiencies in the pipe systems and pump stations for the existing condition. � <br /> Consultant shall use a 10-year and a 100-year design storm as input to the calibrated interior and boundary <br /> condition model. Both will use a dynamic tidal boundary condition at San Francisco Bay, with the peak flow <br /> from the pump stations timed to match the Mean Higher High Water (MHHW) in the Bay. A 100-year tidal � <br /> boundary condition will then be matched with a 2-year design storm to define the tidal flooding deficiencies. i <br /> This model will define existing tidal flood control deficiencies. Sea level rise will also be accounted for in the ' <br /> analysis. <br /> Deliverable:Existing Conditions De�ciency Map. <br /> Schedule: to be completed by August 31,2014. <br /> 2D Hydraulic Model of Areas with Significant Flooding:After the pipe model is run with the 10-and 100-year <br /> design storms, Consultant shall add a single-density 2D component to the streef areas that see significant <br /> flooding. This model will be sufficient to allow Consultant and City to determine flood paths and fiood <br /> extents, and will allow the model to assess the impacts of the storage and routing to the hydrology. One or <br /> two areas are assumed. <br /> Deliverable:At Least Two Areas with 2D Analysis, <br /> Schedulec to be completed by August 31,2014. <br /> Sensitivity of Peak Runoff to Land Use Changes <br /> Consultant shall use the land use database and the City's input to determine potential land use changes <br /> within each basin.The model will be re-run with these potential changes to confirm the assumption that the <br /> infrastructure assessment and proposed improvements will not be impacted by potential land use changes.If <br /> the impacts are significant,the models will be re-rutt with the inclusion of the City's MS4 requirements and <br /> the City's detention requirements. <br /> Deiiverable:Documented Verification of Hydrologic Impact of Future Land Use Changes. <br /> Schedule: to be completed by August 31,2014. <br /> Task 4: Condition Assessme�tt <br /> 1. Pump Statians <br /> Condition Assessment <br /> Consultant shall perForm a desk-�op evaluation that includes preparation for the field assessment, a brief <br /> review of facility design drawings, preparation of field assessment forms, and correspondence with City staff <br /> to obtain record drawings for each facility. Consultant's field effort shall consist of a visual condition <br /> assessment conducted by a multi-disciplinary engineering team lead by the Consultant. One. or more <br /> Redwood City staff inembers who are knowledgeable of the facilities' operati�n and maintenance will need <br /> to be present.The Consultant team will ask questions of the Redwood City staff throughout the assessment <br /> to capture maintenance and performance history. While walking through the pump stations, Consultant will <br /> check condition of the structure, mechanical equipment, and electrical equipment. The budget includes 2 <br /> REV:O1-15-14 JS <br /> Page 14 ofi 18 <br /> ATTY/AGR.2014.007IWood Rodgers Storm Plan <br />
The URL can be used to link to this page
Your browser does not support the video tag.