My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2014-03-24 Closed and Regular
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2014
>
AgdaPkt 2014-03-24 Closed and Regular
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/8/2015 4:19:04 PM
Creation date
3/20/2014 6:17:49 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Regular
Agency Type
City Council
Date
3/24/2014
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
557
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ATrACF 8.A. - Page 27 <br /> 4. The Planned Development Permit and the Vesting Tentative Maps shall <br /> comply with the standards and guidelines in the Zoning Code, the General <br /> Plan of the City of Redwood City, and the subdivision improvement <br /> requirements as set forth in Chapter 30 of the City's Municipal Code and <br /> the Subdivision Map Act. <br /> 5. The Applicant shall track and implement the Mitigation Monitoring and <br /> Reporting Program on file with the CDD. A progress report shall be <br /> submitted to the Planning Division at the time of building permit issuance. <br /> 6. The Applicant shall comply with any and all federal regulatory or state <br /> agency requirements and obtain any and all necessary federal regulatory <br /> or state agency approvals prior to commencement of construction. <br /> 7. Prior to the issuance of a Building Permit, the Applicant shall secure an <br /> Architectural Permit per Article 45 of the Redwood City Zoning Ordinance. <br /> 8. The Applicant shall submit a detailed landscape plan in accordance with the <br /> Pete's Harbor Residential Community Plan, the City's landscaping and <br /> water conservation requirements and guidelines. <br /> 9. The Applicant shall provide all residential tenants with a real estate <br /> disclosure acknowledging the project's proximity to the San Carlos Airport. <br /> The language in the real estate disclosure shall be subject to the review of <br /> the San Carlos Airport Manager. <br /> Should the Applicant and San Carlos Airport agree to an avigation <br /> easement, it shall be the Applicant's responsibility to provide the City with a <br /> copy of said agreement. <br /> Engineering Conditions <br /> 10. Applicant shall contribute its fair share or construct improvements per the <br /> East 101 Infrastructures Fair Share Plan. The City has an Infrastructure <br /> Plan for any development East 101, which establishes fair share mitigation <br /> for public improvements in the project vicinity including roadway <br /> improvements, water and sewer line upgrade, etc. The Applicant would be <br /> required to contribute to this program based on the number of equivalent <br /> dwelling units established in the project. <br /> 11. Project must meet fire flow requirements as established by the Fire <br /> Department which are based on the International Fire Code and the <br /> California Fire Code. Fire flow tests are typically performed during the <br /> preliminary design phase but must be completed prior to submittal of final <br /> design. Applicant shall contact the Fire Department for fire flow <br /> requirements, and then submit a written fire flow test request to <br /> Engineering. <br /> ATTY/RESO.2967/CC PETE'S HARBOR—DENYING APPEAL AND APPROVING PROJECT <br /> REV:03-18-14 VR <br /> Page 7 of 19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.