Laserfiche WebLink
L <br /> Table 1.1 = co <br /> 2003 IMPACTS AND MITIGATION MEASURES AS APPLIED TO THE CURRENT PETE'S HARBOR PROJECT D <br /> Potential Potential ^' 1) <br /> Significance Significance c)) CI) <br /> Without Mitigation With <br /> i <br /> Impacts Mitigation Mitigation Measures Responsibility Mitigation <br /> co <br /> LAND USE <br /> Impact 4-1: Project Relationships to Existing NA Mitigation 4-1. The mitigation is not required. NA NA <br /> Overhead Electrical Transmission Lines. The <br /> impact would not occur. <br /> Impact 4-1a: Project Compatibility with Existing LS Mitigation 4-1a. The City shall establish, as a City,Applicant LS <br /> Industrial Uses and San Carlos Airport Flight condition of project approval, a requirement <br /> Operations. The proposed project would be located formulated to run with the project property title,that: <br /> in the vicinity of existing, extended-hour heavy (1)prospective project residents (including <br /> commercial and industrial uses in the Bair Island prospective purchasers and tenants)of all project <br /> Road/Seaport Boulevard/Port of Redwood City area, residential units shall be notified in writing by the <br /> as well as below existing San Carlos Airport flight seller or person offering a unit for rent that there are <br /> operations. Activities associated with the existing existing extended-hour, heavy commercial and <br /> heavy commercial and industrial uses in the area industrial activities in the area, as well as airport <br /> (e.g., asphalt batch plant, concrete ready mix batch flight operations associated with San Carlos Airport, <br /> plant, heavy equipment yards, metal recycling that may have perceived daytime and nighttime <br /> operations)present potential incompatibilities with visual, traffic, noise/vibration, and/or air quality- <br /> the proposed residential component of the project, related nuisance effects; and (2)this written <br /> including possible visual impacts(light intrusion and disclosure shall be included in the sale and rental <br /> glare, visual distraction),traffic conflicts, noise and agreement materials to be signed by the prospective <br /> vibration, air quality(especially dust), and City land project residents. This disclosure document would <br /> use policies regarding compatibility between future require the buyer's/tenant's initials and <br /> *Section 3 (Current Project Relationship to 2003 EIR Conclusions) explains any modifications to 2003 EIR impact and mitigation measures. A <br /> complete, verbatim listing of the impact and mitigation conclusions of the 2003 EIR has been prepared for each environmental topic (e.g., land <br /> use; visual factors; population, housing, and employment; transportation and circulation; biological resources) and is available for review at the m <br /> City of Redwood City Community Development Department, City Hall, 1017 Middlefield Road, Redwood City, California (phone: 650-780-7234). <br /> -a > <br /> S = Significant m m <br /> LS = Less than significant j v <br /> SU = Significant unavoidable impact ° E <br /> NA = Not applicable <br /> T:110695 Pete's Harbor EIR Addendumlrevised addendum no 21Table 1-1(10695-01).doc <br />