My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2014-03-24 Closed and Regular
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2014
>
AgdaPkt 2014-03-24 Closed and Regular
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/8/2015 4:19:04 PM
Creation date
3/20/2014 6:17:49 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Regular
Agency Type
City Council
Date
3/24/2014
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
557
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MIG F 8.A. - Page 237 <br /> City of Redwood City Revised Elm Huaenaurn <br /> January 22, 2014 Page 2-36 <br /> 2.4.2 Residential Changes <br /> (a) Current Project. The current Pete's Harbor project would include 411 apartments and <br /> associated private and public amenities. On the south portion of the site, adjacent to the <br /> existing Villas at Bair Island apartment-marina complex, 311 apartments would be located in a <br /> 5-story building wrapped around a 61�-story aboveground parking garage. The maximum height <br /> of this combination structure (including concealed rooftop equipment) would be 75 feet. On the <br /> west and north portions of the site, ten 3-story buildings would house a total of 100 apartments, <br /> with ten apartments in each "10-plex" building. The maximum height of each 10-plex building <br /> would be 45 feet. <br /> The overall Pete's Harbor residential density would be 38.52 units per acre (411 units/10.67 <br /> acres of land area).' All parking for residents, guests, and visitors would be located on-site, with <br /> 850 parking spaces. Boat lessees within the commercial marina will be provided with an <br /> additional 33 on-site parking spaces, for a total of 883 parking spaces. Included in the total <br /> parking supply are motorcycle spaces, ADA (American with Disabilities Act) spaces, electric <br /> vehicle charging stations, and BCDC public access spaces. Bike storage for residents would be <br /> included in the parking garage, and public bike racks would be located throughout the project <br /> site. <br /> (b) Differences. Including both the Pete's Harbor and Peninsula Marina properties, the 2003 <br /> EIR project evaluated 1,930 condominiums on approximately 30.87 acres of land identified for <br /> residential use, including associated public and private outdoor space. The 2003 EIR project <br /> residential breakdown included: (1) approximately 1,831 condominiums in 13 multi-story <br /> buildings with a maximum height of 260 feet, and (2) 99 townhouses 24 feet in height. The <br /> overall density of the 2003 EIR project residential areas was approximately 62.5 units per acre <br /> (1,930 units/30.87 residential acres). <br /> The 13.21-acre Pete's Harbor portion of the 2003 EIR project included 633 residential units, <br /> including associated public and private outdoor space, in an array of five 21-story residential <br /> towers (up to 240 feet in height), and numerous low-rise residential flats and townhouses. The <br /> overall density of the 2003 EIR Pete's Harbor residential area was 54.81 units per acre (633 <br /> units/11.55 residential acres). The current Pete's Harbor project would include 411 apartments, <br /> or 65 percent of the residential units previously proposed, at a density of 38.52 units per acre. <br /> In summary regarding the residential components of the various past and present proposals, the <br /> 2003 EIR evaluated a proposal totaling 1,930 multifamily residential units on two non- <br /> contiguous properties (Peninsula Marina and Pete's Harbor). The 2007 Addendum evaluated <br /> 796 multifamily units on one of those properties (Peninsula Marina/Peninsula Park, now One <br /> Marina). Currently, a total of 660 multifamily units are either occupied/under construction (One <br /> Marina = 249 units) or proposed (Pete's Harbor = 411 units) on the two properties. <br /> Parking for 2003 EIR project residents, guests, and visitors (3,860 spaces, or 2 spaces per unit) <br /> was located on-site in enclosed structures (3,357 spaces) and on surface lots (503 spaces), <br /> including 1,266 spaces (2 spaces per unit) for Pete's Harbor, located in enclosed structures <br /> (1,087 spaces) and on surface lots (179 spaces). For the current Pete's Harbor project, parking <br /> 'Redwood City policy includes on-site open space--but not water area (i.e., marinas)--in residential <br /> density calculations. The total site area = 10.67 acres of land area + 3.18 acres of inner marina area = <br /> 13.85 acres. <br /> T.110695 Pete's Harbor EIR Addendumlrevised addendum no 212(10695-01).doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.