Laserfiche WebLink
MIG F 8.A. - Page 245 <br /> City of Redwood City Revised Elm Auaenaurn <br /> January 22, 2014 Page 3-4 <br /> Conclusion. The mitigation identified in the 2003 EIR for Impact 4-la remains applicable to the <br /> current Pete's Harbor project and would reduce the impact to a less-than-significant level. <br /> Impact 4-2 Analysis: Project Compatibility with Adjacent Residential Land Uses. The <br /> certified 2003 EIR indicated that the overall residential density of the Marina Shores Village <br /> project would be approximately 62.5 units per acre, with residential building heights of up to 260 <br /> feet, whereas existing neighboring multifamily residential developments along Bair Island Road <br /> (Villas at Bair Island and Marina Pointe developments) have a maximum density of <br /> approximately 30 units per acre and a maximum building height of four stories (approximately <br /> 48 feet). The 2003 EIR concluded that potentially significant adverse land use incompatibilities <br /> would result. <br /> The 2003 EIR concluded that, if implemented, mitigation measures identified in EIR chapter 5 <br /> (Visual Factors) would reduce this potential land use compatibility impact to a less-than- <br /> significant level; generally, these mitigations recommended reducing the project's maximum <br /> building height to 50 feet, and indicated that, if such a height reduction was determined to be <br /> infeasible and was not implemented, the resulting land use impact would be significant and <br /> unavoidable. <br /> The residential density of the current Pete's Harbor project would be approximately 38.52 units <br /> per acre, with one building height of 70 to 75 feet (the wraparound apartment building with <br /> parking garage) and ten building heights of up to 45 feet. These currently proposed density and <br /> building height characteristics are substantially reduced and are more compatible with existing <br /> conditions (including One Marina, under construction and partially occupied, whose maximum <br /> height will be 60 feet). However, the proposed maximum height of 70 to 75 feet for the one <br /> Pete's Harbor building, and that building's mass and density, are still considered greater than <br /> existing conditions in the vicinity, and would therefore still represent a potentially significant land <br /> use compatibility impact. <br /> Conclusion. The mitigation has been modified. The mitigation identified in the 2003 EIR for <br /> Impact 4-2 required implementation of EIR Mitigations 5-2 through 5-5, which are discussed in <br /> section 3.2 (Visual Factors) of this Addendum. Mitigation 5-2 (Visual Impacts on Views and <br /> Vistas and on the Character of the Surrounding Area) and Mitigation 5-3 (General Visual <br /> Compatibility Impact) will no longer be required due to the reduced heights of the project <br /> buildings. Mitigation 5-5 (Shadow Impacts) will no longer be required because the shadow <br /> impacts of the current project are considered less-than-significant. Mitigation 5-4 (Potential <br /> Light and Glare Impacts) remains applicable to the current project and would reduce this impact <br /> to a less-than-significant level. <br /> Impact 4-3 Analysis: Project Inconsistency with "Smart Growth" Policies and Criteria. <br /> The certified 2003 EIR found that the proposed Marina Shores Village project embodied a <br /> number of fundamental "smart growth" characteristics, but also identified a number of potential <br /> specific project inconsistencies with adopted Redwood City and Association of Bay Area <br /> Governments (ABAG) "smart growth" policies, in particular related to adequate water supply, <br /> adequate park facilities, adequate transit links, sufficiently convenient retail provisions, and <br /> adequate provision of below-market-rate housing. The associated 2003 EIR mitigation <br /> indicated that incorporation of such provisions (adequate water supply, adequate park facilities, <br /> adequate transit links, sufficient retail provisions, etc.) to City satisfaction would result in less- <br /> than-significant impacts associated with "smart growth." <br /> T.110695 Pete's Harbor EIR Addendumlrevised addendum no 213(10695-01).doc <br />