My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2014-03-24 Closed and Regular
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2014
>
AgdaPkt 2014-03-24 Closed and Regular
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/8/2015 4:19:04 PM
Creation date
3/20/2014 6:17:49 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Regular
Agency Type
City Council
Date
3/24/2014
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
557
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MIG F 8.A. - Page 285 <br /> City of Redwood City Revised Elm Auaenaurn <br /> January 22, 2014 Page 3-44 <br /> temporary water quality impacts. The associated 2003 EIR required several associated <br /> mitigation measures, subject to approval by the Corps, Dredged Materials Management Office <br /> (DMMO--a joint federal-state program), BCDC, and RWQCB. <br /> The current Pete's Harbor project would not include any dredging or marina fill operations; <br /> however, the project would reconfigure the inner marina within its existing 3.18-acre footprint, <br /> including installation of a hand boat launch on a floating dock. This process would result in <br /> much reduced, but still potentially significant water quality impacts resulting from the <br /> disturbance of marina bottom sediments, such as increased turbidity and localized releases of <br /> trace elements, compared to the 2003 project. <br /> Conclusion. Modified impact and mitigation. Impact and Mitigation 9-3 have been modified to <br /> remove references to dredging and sheet piling, and to add references to the inner marina <br /> reconfiguration and hand boat launch installation proposed by the current project. In addition, <br /> the mitigation has been updated with current jurisdictional agency requirements, by replacing <br /> the various agency permit requirements previously cited with a general Joint Aquatic Resource <br /> Permit Application (JARPA), which would encompass the requirements of all the interested <br /> permitting agencies, including the California Department of Fish and Wildlife (CDFW). A cross- <br /> reference to Mitigation 8-1 (Impacts on Steelhead and Chinook Salmon), 8-2 (Impacts on <br /> Essential Fish Habitat), 8-3 (Impacts on the California Clapper Rail), and 8-6 (Project Loss of <br /> Saline Emergent Wetlands) has been added. Mitigation 9-3 as modified remains applicable to <br /> the current Pete's Harbor project and remains sufficient to reduce this impact to a less-than- <br /> significant level. <br /> Impact 9-4 Analysis: Project Impacts on Marina and Creek Sedimentation and <br /> Associated Creek/Bay Water Quality Impacts. The certified 2003 EIR indicated that the <br /> project-related reduction in marina area would reduce the tidal prism and result in increased <br /> rates of siltation, requiring more frequent dredging in the future, and resulting in more frequent <br /> water quality disturbances. The associated 2003 EIR mitigation included a requirement for <br /> additional hydraulic analyses to determine if the marinas would sufficiently self-scour, or <br /> whether there would be any potential future increased need to dredge Redwood Creek. <br /> The current Pete's Harbor project would not fill any marina area. <br /> Conclusion. Mitigation 9-4 is no longer required. The currently proposed Pete's Harbor project <br /> would not fill any marina area, and this impact would not occur. <br /> Other Impacts. The certified 2003 EIR determined that the previous Marina Shores Village <br /> project would have less-than-significant impacts on the site peak stormwater run-off flow rate, <br /> groundwater recharge, flooding, and long-term marina tidal water circulation rates and <br /> associated long-term water quality conditions. The current Pete's Harbor project includes no <br /> changes or new conditions that would adversely affect these conclusions. <br /> T.110695 Pete's Harbor EIR Addendumlrevised addendum no 213(10695-01).doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.