My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2014-03-24 Closed and Regular
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2014
>
AgdaPkt 2014-03-24 Closed and Regular
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/8/2015 4:19:04 PM
Creation date
3/20/2014 6:17:49 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Regular
Agency Type
City Council
Date
3/24/2014
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
557
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MIG F 8.A. - Page 287 <br /> City of Redwood City Revised Elm Huaenaurn <br /> January 22, 2014 Page 3-46 <br /> Conclusion. The 2003 EIR concluded that, in the absence of substantial evidence at the time <br /> that a subsequent WSA would be able to identify sufficient water supply to reduce project <br /> impacts to a less-than-significant level, Impact 10-1 should be identified as significant and <br /> unavoidable "until an achievable water supply sourced is identified." Mitigation 10-1 described <br /> the State requirement for a subsequent water supply analysis, reflecting City progress on its <br /> water supply and conservation strategies. The current Pete's Harbor project water demand is <br /> already factored into the City's most recent UWMP (which was adopted in 2010, after the 2003 <br /> project), and the impact on water service demand would be less-than-significant. Mitigation 10- <br /> 1 is no longer required. <br /> Impact 10-2 Analysis: Project-Related and Cumulative Impacts on Sewage Treatment <br /> and Transmission Capacity. <br /> As discussed in the 2003 EIR, the Marina Shores Village project would have generated a net <br /> increase of approximately 317,000 gallons of wastewater per day (gpd), with the previous Pete's <br /> Harbor component contributing about 105,000 gallons of that net increase. Based on the same <br /> formula from the 2003 EIR, the currently proposed Pete's Harbor project would generate a net <br /> increase of approximately 64,000 gpd, approximately 60 percent of the previous Pete's Harbor <br /> wastewater generation. <br /> Conclusion. Redwood City Engineering staff have determined that sewage treatment and <br /> transmission capacity exists for the current Pete's Harbor project due to current, improved <br /> conditions, including substantial ongoing water conservation efforts and improvements <br /> throughout the city, as well as sewage treatment and transmission capacity improvements <br /> implemented as part of the One Marina development ("Peninsula Marina" in the 2003 EIR) <br /> under construction and partially occupied south of the Pete's Harbor site. Unlike in 2003, the <br /> City no longer exceeds its Stage 1 treatment allocation from the South Bayside System <br /> Authority (SBSA). The impact on treatment and transmission capacity would be less-than- <br /> significant. Mitigation 10-2, which would have required the applicant to fund additional dry <br /> weather treatment capacity from SBSA to accommodate the project as well as implement <br /> various infrastructure improvements, is no longer required. <br /> Impact 10-3 Analysis: Project-Related Increase in Police Service Demands. The certified <br /> 2003 EIR concluded that buildout of the Marina Shores Village project would have required <br /> approximately four additional sworn police officers and requisite training, support staff, facilities, <br /> and equipment (based on an estimated on-site population increase of 3,910 residents). The <br /> current Pete's Harbor project would result in a population of approximately 855 residents (i.e., a <br /> 78 percent reduction from the previous Marina Shores Village estimate) and a proportional <br /> reduction in the need for additional police services. Therefore, the current Pete's Harbor project <br /> would require the equivalent of about 0.9 additional sworn officers, which generally would be <br /> funded from project property taxes. <br /> Conclusion. Modified impact and mitigation. Impact and Mitigation 10-3 have been modified to <br /> reflect the reduced project. Although the current Pete's Harbor project would result in reduced <br /> demands for additional police services, the 2003 EIR-required mitigation--completion of a <br /> staffing survey, etc.--remains applicable to the current Pete's Harbor project and remains <br /> sufficient to reduce this impact to a less-than-significant level. <br /> Impact 10-4 Analysis: Emergency Response and Evacuation Impacts. The certified 2003 <br /> EIR identified the possibility that project-related traffic congestion in the vicinity could inhibit <br /> T.110695 Pete's Harbor EIR Addendumlrevised addendum no 213(10695-01).doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.