Laserfiche WebLink
�, � .�.�.�,�.�. .� � � � <br /> E. Sheds or storage containers may be left on the street in one location for no longer than one month. The <br /> engineer shall approve the location(s)for storage. <br /> F. Storage containers and sanitary facilities shall not have graffiti and shall be painted in subdued colors. <br /> G. Reflectors and/or barricades shall be required for all equipment and material left on the street overnight. <br /> 1.13 STORM WATER POLLUTION PREVENTION <br /> A. The contractor is advised that the City of Redwood City and all other municipal stormwater dischargers in <br /> San Mateo County are co-permittees under the National Pollutant Discharge Elimination System <br /> (NPDES) Permit Number CAS612008. This permit prohibits the discharge of illicit discharges (non <br /> rainwater)into the storm drain system, unless specifically exempt. As a condition of this permit the City of <br /> Redwood City and San Mateo County have implemented a local Storm Water Management Plan, <br /> adopted respective enabling ordinances prohibiting illicit discharges, and adopted "Best Management <br /> Practices"(BMPs)to assist contractors and citizens with alternatives. <br /> B. The central goal of the Storm Water Management Plan and BMPs is to reduce the amount of pollution in <br /> run-off and establish procedures to address and control storm water pollution resulting from both public <br /> and private sector construction activity within the City. <br /> C. All work performed under this contract and all contractors and their associates and/or employees are <br /> required to comply with all applicable Storm Water regulations and to implement BMPs at all times. � <br /> D. Refer to Section 02133 (Stormwater Pollution Prevention) for more particulars on how to address <br /> pollution issues. <br /> 1.14 SAFETY <br /> A. Contractor, before beginning construction, is to provide, maintain and remove upon completion of work all <br /> barricades around openings and excavations, fences around areas and other temporary construction, <br /> warning signals, signs, and flagmen as required to direct traffic through the work area and or to redirect <br /> traffic to detours. <br /> B. The temporary work shall conform to all requirements of State and Local Authorities, and of the <br /> Underwriters in regard to operation, safety, and fire hazards. The Contractor shall furnish and complete <br /> all items necessary for such construction and for conformity with such requirements whether or not called <br /> for under the separate divisions of these specifications. <br /> C. Contractor agrees that he will assume sole and complete responsibility for job site conditions during the <br /> course of construction of this project, including safety of all persons and property; that this requirement <br /> shall apply continuously and not be limited to normal working hours. <br /> 1.15 FINAL CLEANING <br /> A. Contractor shall execute final cleaning prior to final inspection, using only properly skilled workers. <br /> B. Remove grease, dust, dirt,stains, and other foreign materials from finished surFaces. <br /> C. Repair, patch, and touch up marred surfaces to match adjacent finishes. <br /> D. Clean Site; mechanically sweep paved areas. <br /> E. Remove waste and surplus materials, rubbish,and construction facilities from Site. <br /> SPECIAL CONDITIONS <br /> BREWSTER AVENUE BICYCLE IMPROVEMENTS—SIGNING AND STRIPING PROJECT 00800-3 <br />