Laserfiche WebLink
progress reports and photographs reflecting the status of construction and <br /> percentage completion of the project. CM wiii mainGain daily reaords during <br /> oonstruction of the project showing weathe� oonditions, personnel of the <br /> Contractor and Subcorrtractor at the site, work accomplished, prablems <br /> encountere,d and other matters materiaily affecting the project, camptetion of <br /> the project or canstruction cost to complete constn�ction of the project. CM <br /> shall maintain project reoards for test results and speciai inspection resuits. <br /> b. Provide monthly progress reports on the project. <br /> 5. Site observations of project, CM services shail include but are not limited to the <br /> following: <br /> a. CM shall be on-site during canstruction of the project and substantially at ali <br /> times during which there are conshuction activities at the site. CITY and CM <br /> may agree ta the amaunt of time required to be at the site for observation, <br /> however this does not relieve the CM from the requirement of having <br /> knowtedge af the status of the wo�ic. <br /> b. C�ordinate testing, lab services and inspections, this includes by outside firms. <br /> CM will wo�lc with the Building Department for permit inspections coordination <br /> and final approvals of permit. Provide testing and test resuits by testing finn <br /> aeceptabie to CITY. Such testing services shall be a reimbursable expense as <br /> described in Task 5. <br /> c. Maintain at the site #he following documents at a minimum: Contra�t, <br /> Drawings, Spec�cations, approved Change Orders, Submittals, building <br /> permit, SWPPP and assaciated testing o� monitaring dacumentation, other <br /> permits, applicable codes, rules and regulation and other written or electronic <br /> materials relating to the project. <br /> d. CM will endeavor to guard the CITY against defects and deficiencies in <br /> construction and workmanship of the project on the basis of its site <br /> observations, and a quality control program established and implemented <br /> hereunder to monitor canstnaction woricmanship for conformity: 1) accepted <br /> indusiry standards; 2) applicable laws, codes, regulatians, ordinances or <br /> rutes: 3)and the requirernents of the construction documents. <br /> e. CM shaU reject work whenever in the ordinary course of discharging its <br /> services the CM discovers or observes patent conditions of defective or � <br /> deficient construction and warkmanship which as or may have an adverse <br /> impact upon the project's life-safety systems or aperations, structural <br /> elements or integrity of the safety of persons or property. CM shall take <br /> prampt action appropriate under the circumstances, incfuding stopping the <br /> work and thereupon notifying the CITY in writing. CM's responsibilities <br /> hereunder shall be limited ta defective or defiaent work or an apparent or <br /> patent nature. <br /> f. Review the Contactor safety program and the requirements of the canstruction <br /> documents and applicable law. CM shall monitor the Contracto�'s c:ampliance <br /> with safety programs and advise the CtTY of ineasures, if any, nevessary or <br /> appropriate to obtain the Contractw"s compliance. By undertaking the <br /> obligatian hereunder, CM shall not be deemed to have assumed responsibility <br /> of the adequacy or suff'�ciency of safety programs implemented by the <br /> Gantractor, but the CM is responsible for verifying that the Contractor has <br /> REV:04-06-IS ML6 <br /> Page 8 of 10 <br /> ATTY/AGR.Amend No. 11Gilbane Building Company <br />